Differences between revisions 3 and 7 (spanning 4 versions)
Revision 3 as of 2014-04-08 00:22:35
Size: 897
Editor: tomaru
Comment:
Revision 7 as of 2014-04-08 13:18:12
Size: 1983
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Line 5: Line 4:
First kick-off meeting with MESCO for cryostat installation: Apr. 10 at Kamioka   * First kick-off meeting with MESCO for cryostat installation at Apr. 10 at Kamioka. We will discuss about installation schedule of the end cryostats.
Line 8: Line 7:
 . [[Cryo-installation.pdf|Cryo-installation (T. Tomaru)]]   * [[attachment:Cryo-installation.pdf|Cryo-installation (T.Tomaru)]]
Line 13: Line 12:
  * We will release a specification document of duct shield in this week. Three duct shield will be fabricated in this FY.
Line 15: Line 15:
  * We will release a specification document of first three low-vibration cryocoolers for the duct shields in this week. Now we discuss about the cost of one-stage pulse-tube cryocoolers with the cryocooler company since they are under considering the price down of the PTC. If the price is acceptable, we will not chose solvey cryocoolers but chose PTCs.
Line 19: Line 20:
  * Heat link (Sakakibara)
Line 20: Line 22:
   * Heat link (Sakakibara)   * Design (PF, IM, IMR) (Hirose, Sekiguchi, Rahul)
Line 22: Line 24:
   * Design (PF, IM, IMR) (Hirose, Sekiguchi, Rahul)   * Fabrication (PF, IM, IMR) (Tomaru): Suzuki-san and I had meeting with Mitaka-koki Co. for Cryo-pendulum fabrication. They have interesting in our cryo-payload fabrication and accepted the style that they fabricate the payload with R&D with us.
Line 24: Line 26:
   * Fabrication (PF, IM, IMR) (Tomaru)   * Moving Mass (Chen, Tomaru): I got stepping motor which can work at cryogenic temperature but it didn't have driver. Can we get it?
Line 26: Line 28:
  * Recoil mass   * Recoil mass
Line 28: Line 30:
  * Sapphire Mirror (Hirose)   * Sapphire Mirror (Hirose)
Line 30: Line 32:
   * Sapphire Mirror Suspension (Chen, Sascha, Yamamoto)   * Sapphire Mirror Suspension (Chen, Sascha, Yamamoto) Yesterday, we discussed the strategy. Fiber nail head is hooked by blade spring which is similar to that from Shinkosha. For comparison, we must collect quotations for flat cut or round polish.
Line 32: Line 34:
  * Test    * Test

Cryogenic System Integration Meeting 2014 FY

2014.04.07

  • Management & Schedule (Suzuki)

    • First kick-off meeting with MESCO for cryostat installation at Apr. 10 at Kamioka. We will discuss about installation schedule of the end cryostats.
  • Installation (Tomaru, Suzuki)
  • Mirror Cryostat (Sakakibara, Kimura)
  • Duct Shield (Sakakibara, Kimura)
    • We will release a specification document of duct shield in this week. Three duct shield will be fabricated in this FY.
  • Cryocoolers (Tomaru, Suzuki)
    • We will release a specification document of first three low-vibration cryocoolers for the duct shields in this week. Now we discuss about the cost of one-stage pulse-tube cryocoolers with the cryocooler company since they are under considering the price down of the PTC. If the price is acceptable, we will not chose solvey cryocoolers but chose PTCs.
  • Room temperature SAS (Sekiguchi, Takahashi)
  • Cryo-Payload
    • Heat link (Sakakibara)
    • Design (PF, IM, IMR) (Hirose, Sekiguchi, Rahul)
    • Fabrication (PF, IM, IMR) (Tomaru): Suzuki-san and I had meeting with Mitaka-koki Co. for Cryo-pendulum fabrication. They have interesting in our cryo-payload fabrication and accepted the style that they fabricate the payload with R&D with us.

    • Moving Mass (Chen, Tomaru): I got stepping motor which can work at cryogenic temperature but it didn't have driver. Can we get it?
    • Recoil mass
    • Sapphire Mirror (Hirose)
    • Sapphire Mirror Suspension (Chen, Sascha, Yamamoto) Yesterday, we discussed the strategy. Fiber nail head is hooked by blade spring which is similar to that from Shinkosha. For comparison, we must collect quotations for flat cut or round polish.
    • Test
  • Baffle and Auxiliary Optics Subsystem (Akutsu)
  • Minutes(K. Yamamoto)