|| 023 || 2013 Dec. 10 || ||<#ff0000> Urgent! ||Overall design||Baffle design : Mirror can observe the frame of hole of radiation shield for laser beam. It is an issue of scattered light. We also consider how to reduce the size of baffle. || || || 024 || 2013 Dec. 10 || Y. Aso, E. Hirose ||<#ff0000> Urgent! ||Sapphire monolithic suspension||Yoichi Aso and Eiichi Hirose prepare the plan of optical contact and screw, respectively. ||24 Dec 2013|| || 025 || 2013 Dec. 10 || E. Hirose ||<#ff0000> Urgent! ||Sapphire monolithic suspension||Eiichi prepares document describing planned test and contributions. ||24 Dec 2013|| || 026 || 2013 Dec. 10 || D. Chen ||<#ff0000> Urgent! ||Sapphire monolithic suspension||Dan will ask Ryutaro what is pro and con of large intermediate mass. ||17 Dec 2013|| || 027 || 2013 Dec. 10 || T. Suzuki ||<#ff0000> Urgent! ||Sapphire monolithic suspension||Suzuki-san has data of friction between sapphire and metal and he will circulate later. ||17 Dec 2013|| || 028 || 2013 Dec. 10 || Y. Aso ||<#ff0000> Urgent! ||Vertical spring||Yoichi checks vibration transfer function of heat links with extra pendulums and whether weight of mass of these pendulums can be on the order of kg using ANSYS or COMSOL. || || || 029 || 2013 Dec. 10 || T. Suzuki, S. Koike, C. Tokoku ||<#ff0000> Urgent! ||Vertical spring||Suzuki-san asks Koike-san to provide design drawing of shield. Tokoku-san learns how to handle it in CAD. || || |
Cryopayload's Action Item List
General Descriptions
This is a list of action items identified in the cryopayload meeting after its kick-off (2013 Nov 15). If you want to know the previous information or historical path to the cryopayload meetings, please refer to CRY-AOS meeting.
Action Items
A/I# |
Identified on |
Assigned to |
Status/Output |
Related to |
Description |
Due date |
001 |
2013 Nov. 19 |
Sekiguchi, Hirose |
Closed. Takanori and Osamu Miyakawa found the document about OSEM (it includes the schematic design of circuit) by themselves. |
Control |
Ask somebody in LIGO details of the circuit for OSEM. |
2013 Nov. 26 |
002 |
2013 Nov. 19 |
R. Takahashi |
Closed. Unfortunately, there is not 3 dimensional but only 2 dimensional design drawing.->#016 |
Overall design |
3-D design drawing of Type-A is necessary (ASAP!). Ask to Gianni. |
2013 Nov. 26 |
003 |
2013 Nov. 19 |
R. Takahashi |
Closed. Ryutaro explained. However, further discussion is necessary.->(#011) |
Vertical spring |
About blade metal spring (vertical spring), the schedule and strategy and so on will be summarized by R. Takahashi, Ishizaki, Sekiguchi, and K. Yamamoto, and reported in the next meeting. |
2013 Nov. 26 |
004 |
2013 Nov. 19 |
K. Yamamoto |
Closed. (1)Eric is busy. Moreover, Eric does not use ANSYS or COMSOL. However, Yoichi (or his student) will calculate it using COMSOL (Kazuhiro wrote Yoichi on Microsoft Project).(2)No files remain in Ando lab. |
Material |
About the masses, including a recoil mass, intermediate mass, intermediate recoil mass, and platform, the evaluation of the eddy current damping is necessary. K. Yamamoto will ask (1) to Eric Hennes how much he can make his effort for this problem and whether he can provide files for Finite Element Analysis. (2) to Ando or Aso whether Nishi's file for eddy current damping still remains. |
2013 Nov. 26 |
005 |
2013 Nov. 19 |
D. Chen |
Closed. The Picomotor didn’t work at 77K. But that might be because of the cooling shock. So we will have quick cooling test. |
Control |
D. Chen will ask Uchiyama whether a picomotor can survive at cryogenic temperature. |
2013 Nov. 26 |
006 |
2013 Nov. 19 |
D. Chen |
Closed. He received the design drawing from Takanori. |
Control |
D. Chen looks for design drawing of a stage for Type-B, and some commercial stages. |
2013 Nov. 26 |
007 |
2013 Nov. 19 |
K. Yamamoto |
Closed. Kazuhiro rewrote it. |
Control |
The schedule for the control system should be considered again. |
2013 Nov. 26 |
008 |
2013 Nov. 19 |
K. Yamamoto |
Closed. Dan asked Ryutaro. |
Control |
About the procurement of the OSEMs, K. Yamamoto will consult R. Takahashi. |
2013 Nov. 26 |
009 |
2013 Nov. 19 |
T. Suzuki |
Urgent! In KEK, thrust bearing without grease was checked. Suzuki-san will ask the load and speed and so on. The cryogenic test is necessary. (Thrust bearing is about 50mm in diameter and 300kg load). |
Control |
Check whether the thrust bearing can work at the cryogenic temperature. |
2013 Nov. 26 |
010 |
2013 Nov. 19 |
D. Chen (?) |
Closed. (i)In order to fix LED and PD, circuit board is used. We must check circuit board is OK at low temperature. -> #019(ii)Dan shows 7m cable increases the noise. Long cable can generates oscillation at high frequency region. The length of cables for cryo payload is 20m in length. We must check how much the long (flat) cable generates noise. If it is a problem, satellite boxes in vacuum are necessary. (iii)Window of photo detector will be removed because nitrogen gas is in Photo Diode. |
Control |
About OSEM, (i)check about out gas; (ii)check noises by 10-m long line; (iii)check whether the window of photodiode be removed. |
2013 Nov. 26 |
011 |
2013 Nov. 26 |
T. Sekiguchi |
Closed. Takanori summarized and explained.Vibration via heat link (T. Sekiguchi)->#017 |
Vertical spring |
For the basis of discussion, Takanori will summarize the vibration via heat link until this weekend. After that, he and Ryutaro circulate their ideas about vertical spring and we discuss. |
2013 Dec. 1 |
012 |
2013 Nov. 26 |
K. Yamamoto |
Urgent! He rewrote, but again, he must do so. First of all, strategy must be fixed. |
Vertical spring |
Kazuhiro rewrites schedule. |
2013 Dec. 3 |
013 |
2013 Nov. 26 |
K. Yamamoto |
Closed. He explained. Strategies for sapphire monolithic suspension 2(K. Yamamoto)He also revised schedule. |
Sapphire monolithic suspension |
Kazuhiro will summarize the details of schedule for monolithic sapphire suspension based on above discussion by the next meeting. |
2013 Dec. 3 |
014 |
2013 Nov. 26 |
T. Suzuki and K. Yamamoto |
Urgent! |
Sapphire monolithic suspension |
Suzuki-san and Kazuhiro will report the serious lack of human resources on the next year to SEO and EO. |
2013 Dec. 3 |
015 |
2013 Nov. 26 |
R. Kumar |
Urgent! |
Sapphire monolithic suspension |
Rahul investigates how much the lowest frequency of sapphire spring is. After that, we ask it is a problem for observation to Data Analysis group. |
2013 Dec. 10 |
016 |
2013 Dec. 3 |
R. Takahashi, E. Hirose |
Urgent! |
Overall design |
Type A 3 dimension drawing. Ryutaro gives Eiichi 2 dimensional design drawing and Eiichi makes drawings. |
|
017 |
2013 Dec. 3 |
R. Takahashi, H. Ishizaki, T. Sekiguchi |
Urgent! |
Vertical spring |
Design drawing for vertical spring in platform (Ishizaki and Takahashi). Takanori takes care of shape of blade spring. The load on GAS in Type B like is different from that of Ad LIGO like. |
|
018 |
2013 Dec. 3 |
K. Yamamoto |
Urgent! |
Material |
Kazuhiro summarize requirement of magnetization and so on before the meeting with Sumikin |
2013 Dec. 17 |
019 |
2013 Dec. 3 |
R. Takahashi |
Urgent! |
Control |
Ryutaro will consult Saito-san on the outgas of circuit board for OSEM. |
|
020 |
2013 Dec. 3 |
K. Yamamoto |
Urgent! |
Sapphire monolithic suspension |
Kazuhiro summarize the length of sapphire fiber. He must take bending point into account. |
17 Dec 2013 |
021 |
2013 Dec. 3 |
K. Yamamoto |
Urgent! |
Sapphire monolithic suspension |
Kazuhiro write the report about backup plan. |
17 Dec 2013 |
022 |
2013 Dec. 3 |
D. Chen |
Urgent! |
Sapphire monolithic suspension |
He considers structure in the intermediate mass (sapphire blades, stepping motor, stages). Later we discuss. |
17 Dec 2013 |
023 |
2013 Dec. 10 |
|
Urgent! |
Overall design |
Baffle design : Mirror can observe the frame of hole of radiation shield for laser beam. It is an issue of scattered light. We also consider how to reduce the size of baffle. |
|
024 |
2013 Dec. 10 |
Y. Aso, E. Hirose |
Urgent! |
Sapphire monolithic suspension |
Yoichi Aso and Eiichi Hirose prepare the plan of optical contact and screw, respectively. |
24 Dec 2013 |
025 |
2013 Dec. 10 |
E. Hirose |
Urgent! |
Sapphire monolithic suspension |
Eiichi prepares document describing planned test and contributions. |
24 Dec 2013 |
026 |
2013 Dec. 10 |
D. Chen |
Urgent! |
Sapphire monolithic suspension |
Dan will ask Ryutaro what is pro and con of large intermediate mass. |
17 Dec 2013 |
027 |
2013 Dec. 10 |
T. Suzuki |
Urgent! |
Sapphire monolithic suspension |
Suzuki-san has data of friction between sapphire and metal and he will circulate later. |
17 Dec 2013 |
028 |
2013 Dec. 10 |
Y. Aso |
Urgent! |
Vertical spring |
Yoichi checks vibration transfer function of heat links with extra pendulums and whether weight of mass of these pendulums can be on the order of kg using ANSYS or COMSOL. |
|
029 |
2013 Dec. 10 |
T. Suzuki, S. Koike, C. Tokoku |
Urgent! |
Vertical spring |
Suzuki-san asks Koike-san to provide design drawing of shield. Tokoku-san learns how to handle it in CAD. |
|