Differences between revisions 24 and 25
Revision 24 as of 2012-11-04 17:51:22
Size: 10585
Comment:
Revision 25 as of 2012-11-06 16:03:38
Size: 10667
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
 . ・ Reprot from Glasgow (Y. Sakakibara)  . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1381|Reprot from Glasgow (Y. Sakakibara)]]

冷凍機

  • リーダー: 春山富義 (KEK)
  • サブリーダー:内山隆 (ICRR)

Document

低温装置

  • リーダー: 鈴木敏一 (KEK)
  • サブリーダー:内山隆 (ICRR)
  • サブリーダー:木村誠宏 (KEK)
  • サブリーダー(Cryo-Payload):山元一広 (ICRR)

Document

17th cryogenic payload meeting (2012 Nov. 4 ICRR)

  • Reprot from Glasgow (Y. Sakakibara)

  • ・ Measurement of vibration of radiation shield(D. Chen)
  • ・ How to clamp wires for resonators(W. Johnson)
  • ・ Backup plan to suspend sapphire mirror(W. Johnson)
  • ・ Current status(K. Yamamoto)

16th cryogenic payload meeting (2012 Sep. 26 ICRR)

15th cryogenic payload meeting (2012 Aug. 29 ICRR)

14th cryogenic payload meeting (2012 Aug. 8 ICRR)

13th cryogenic payload meeting (2012 July. 4 ICRR)

12th cryogenic payload meeting (2012 June. 6 ICRR)

11th cryogenic payload meeting (2012 April. 25 ICRR)

10th cryogenic payload meeting (2012 April. 4 ICRR)

9th cryogenic payload meeting (2012 Mar. 7 ICRR)

8th cryogenic payload meeting (2012 Feb. 8 ICRR)

第七回 低温懸架打ち合わせ(2012.1.10 ICRR)

第六回 低温懸架打ち合わせ(2011.11.30 ICRR)

第五回 低温懸架打ち合わせ(2011.10.26 ICRR)

第四回 低温懸架打ち合わせ(2011.09.28 ICRR)

第三回 低温懸架打ち合わせ(2011.08.31 ICRR)

第一回 低温懸架打ち合わせ(2011.07.01 KEK)

低温装置打ち合わせ

.Report of annealing for thin Al bundles 2011.06.24 .・ Heat Linkサンプルの焼鈍結果 110627

.Cryostat Shield (4th) 2011.2.24 and Cryostat Shield (4th) 2011.2.25, KEK Cryogenics Centre R110

.Cryostat Shield (4th) 2011.2.14 KEK Cryogenics Centre R110

.Cryostat Shield (3rd) 2011.2.10 KEK Cryogenics Centre R110 Polycom+EVO

.Cryostat 2010.11.18 EVO

KAGRA/Subgroups/CRY (last edited 2023-07-10 12:16:15 by miyoki)