Size: 2156
Comment:
|
Size: 2647
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 29: | Line 29: |
. ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2106|Preliminary design of Type-A suspension system (cryogenic seismic attenuation system) for KAGRA sapphire mirrors(T. Sekiguchi, E. Hirose)]] | |
Line 31: | Line 32: |
. ・ [[https://www.icrr.u-tokyo.ac.jp/~miyoki/KAGRA-CleanBooth.zip|CAD drawing for clean booth(Shinji Miyoki)]] . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2188|Wide-angle baffle(prototype)(T. Akutsu)]] |
|
Line 38: | Line 41: |
* [[KAGRA/Subgroups/CRY/CRYpmeeting|Cryogenic payload meeting]] is held on 13:00 of every Tuesday (ICRR) | * [[KAGRA/Subgroups/CRY/CRYpmeeting|Cryogenic integration and payload meetings]] are held on 13:00 of every Tuesday (ICRR) |
Contents
冷凍機
- リーダー: 春山富義 (KEK)
- サブリーダー:内山隆 (ICRR)
Document
・ICD
低温装置
- リーダー: 鈴木敏一 (KEK)
- サブリーダー:内山隆 (ICRR)
- サブリーダー:木村誠宏 (KEK)
- サブリーダー(Cryo-Payload):山元一広 (ICRR)
Document
Design drawings
Schedule about cryogenic payload
Figure about cryogenic payload (It should be replaced).
Meeting
Cryogenic integration and payload meetings are held on 13:00 of every Tuesday (ICRR)