Size: 2750
Comment:
|
Size: 2752
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 41: | Line 41: |
* [[KAGRA/Subgroups/CRY/CSIM|Cryogenic System Integration Meeting]] : 13:00 of every Tuesday (ICRR) |
|
Line 43: | Line 45: |
* [[KAGRA/Subgroups/CRY/CSIM|Cryogenic System Integration Meeting]] : 13:00 of every Tuesday (ICRR) |
Contents
冷凍機
- リーダー: 春山富義 (KEK)
- サブリーダー:内山隆 (ICRR)
Document
・ICD
低温装置
- リーダー: 鈴木敏一 (KEK)
- サブリーダー:内山隆 (ICRR)
- サブリーダー:木村誠宏 (KEK)
- サブリーダー(Cryo-Payload):山元一広 (ICRR)
Document
Design drawings
Schedule about cryogenic payload
Figure about cryogenic payload (It should be replaced).
Meeting
Cryogenic System Integration Meeting : 13:00 of every Tuesday (ICRR)
Cryogenic integration and payload meetings are held on 15:00 of every Tuesday (ICRR)