Differences between revisions 87 and 91 (spanning 4 versions)
Revision 87 as of 2014-03-20 14:35:21
Size: 2752
Comment:
Revision 91 as of 2015-01-08 22:42:55
Size: 3026
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1405|KAGRA cryostatの設置向きについて(K. Yamamoto)]]
 . ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3190|RF and AF Cabling Policy for KAGRA ISC(Y. Michimura)]]
Line 41: Line 44:
  * [[KAGRA/Subgroups/CRY/CSIM|Cryogenic System Integration Meeting]] : 13:00 of every Tuesday (ICRR)   * [[KAGRA/Subgroups/CRY/CSIM|Cryogenic System Integration Meeting]] : 13:30 of every Tuesday (ICRR)
Line 43: Line 46:
  * [[KAGRA/Subgroups/CRY/CRYpmeeting|Cryogenic integration and payload meetings]] are held on 15:00 of every Tuesday (ICRR)   * [[KAGRA/Subgroups/CRY/CRYpmeeting|Cryogenic payload meetings]] are held on 15:00 of every Tuesday (ICRR)

冷凍機

  • リーダー: 春山富義 (KEK)
  • サブリーダー:内山隆 (ICRR)

Document

低温装置

  • リーダー: 鈴木敏一 (KEK)
  • サブリーダー:内山隆 (ICRR)
  • サブリーダー:木村誠宏 (KEK)
  • サブリーダー(Cryo-Payload):山元一広 (ICRR)

Document

Design drawings

Schedule about cryogenic payload

Meeting

Action Items list

KAGRA/Subgroups/CRY (last edited 2023-07-10 12:16:15 by miyoki)