Size: 2883
Comment:
|
Size: 3026
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
. ・ [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3190|RF and AF Cabling Policy for KAGRA ISC(Y. Michimura)]] |
Contents
冷凍機
- リーダー: 春山富義 (KEK)
- サブリーダー:内山隆 (ICRR)
Document
・ICD
低温装置
- リーダー: 鈴木敏一 (KEK)
- サブリーダー:内山隆 (ICRR)
- サブリーダー:木村誠宏 (KEK)
- サブリーダー(Cryo-Payload):山元一広 (ICRR)
Document
Design drawings
Schedule about cryogenic payload
Figure about cryogenic payload (It should be replaced).
Meeting
Cryogenic System Integration Meeting : 13:30 of every Tuesday (ICRR)
Cryogenic payload meetings are held on 15:00 of every Tuesday (ICRR)