Differences between revisions 34 and 35
Revision 34 as of 2009-06-02 23:14:10
Size: 1433
Editor: whitehole
Comment:
Revision 35 as of 2010-03-31 12:52:24
Size: 1718
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * [[LCGT/subgroup/analysis/Meeting/Analysis2010|作業中ファイル(2010)]]
Line 27: Line 29:
 * [[LCGT/Meeting/Analysis090519|2009-05-19]] === 作業班 ===
 * [[LCGT/subgroup/analysis/Meeting/Analysis090519|2009-05-19]]
 * [[LCGT/subgroup/analysis/Meeting/Analysis090427|2009-04-27]]
Line 29: Line 33:
 * [[LCGT/Meeting/Analysis090427|2009-04-27]] === 解析ミーティング ===
 * [[LCGT/subgroup/analysis/Meeting/Analysis2010|2010]]
 * [[LCGT/subgroup/analysis/Meeting/Analysis2009|2009]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

目的

  • 世界初の重力波信号の直接検出に最大限貢献することを目指す。
    初検出後は、重力波天文学の創生に寄与することが LCGT project の目標である。

Main Target among GW sources

  • 連星中性子合体からの重力波を年数回程度観測すること。

Conceptual design

Preliminary design

Detailed design

Meeting

作業班

解析ミーティング

KAGRA/Subgroups/DAS/gw_search (last edited 2012-06-06 18:25:11 by OsamuMiyakawa)