Size: 1061
Comment:
|
Size: 1118
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* task * Share Data Quality Reports during observation run * Infrastructure - how to respond to LVAlerts schedule and monitor analyses * Analyses - proposed analyses to be run * Reporting - how to prsent the results of the analyses |
* Goal * Share Data Quality Reports during observation run as activity of RRT(Rapid Response team) * Task * Infrastructure - how to respond to LVAlerts schedule and monitor analyses * Analyses - proposed analyses to be run * Reporting - how to present the results of the analyses |
Line 21: | Line 22: |
* [[https://git.ligo.org/detchar/data-quality-report-design-document|DQR design document]] | * [[https://git.ligo.org/detchar/o4-data-quality-report-design-document|DQR design document for O4]] |
Data Quality Report(DQR)
- Goal
- Share Data Quality Reports during observation run as activity of RRT(Rapid Response team)
- Task
- Infrastructure - how to respond to LVAlerts schedule and monitor analyses
- Analyses - proposed analyses to be run
- Reporting - how to present the results of the analyses
- regular meeting
- biweekly Friday 01:00~02:00 JST on zoom (zoom link is available in minutes)
- Mailing list
visit web page and register the mailing list (lvk-dqr).
Presentation