Differences between revisions 19 and 26 (spanning 7 versions)
Revision 19 as of 2021-09-24 17:04:56
Size: 1061
Comment:
Revision 26 as of 2021-09-27 23:12:54
Size: 1476
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * task
  * Share Data Quality Reports during observation run
 
* Infrastructure - how to respond to LVAlerts schedule and monitor analyses
   * Analyses - proposed analyses to be run
   * Reporting - how to prsent the results of the analyses
 * Goal
  * Share Data Quality Reports during observation run as activity of RRT(Rapid Response team)
 * T
ask
  * Infrastructure - how to respond to LVAlerts schedule and monitor analyses
  * Analyses - proposed analyses to be run
  * Reporting - how to present the results of the analyses
Line 15: Line 16:
== Installation ==
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DQR/TaskManager|Install TaskManager]]
Line 17: Line 21:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12849|LVK DET call on Apr. 26th, 2021 (Yamamoto)]]  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13326|DetChar meeting, Sep. 27 2021 (Yuzurihara)]]
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12849|LVK DET call, Apr. 26th, 2021 (Yamamoto)]]
Line 21: Line 26:
 * [[https://git.ligo.org/detchar/data-quality-report-design-document|DQR design document]]  * [[https://computing.docs.ligo.org/guide/authentication/#kagra|authentication by X.509 for KAGRA]]
 * [[https://git.ligo.org/detchar/o4-
data-quality-report-design-document|DQR design document for O4]]

Data Quality Report(DQR)

  • Goal
    • Share Data Quality Reports during observation run as activity of RRT(Rapid Response team)
  • Task
    • Infrastructure - how to respond to LVAlerts schedule and monitor analyses
    • Analyses - proposed analyses to be run
    • Reporting - how to present the results of the analyses
  • regular meeting
    • biweekly Friday 01:00~02:00 JST on zoom (zoom link is available in minutes)
    • meeting + minutes

  • Mailing list
    • visit web page and register the mailing list (lvk-dqr).

Installation

Presentation

KAGRA/Subgroups/DET/DQR (last edited 2022-04-10 18:47:06 by HirotakaYuzurihara)