Differences between revisions 19 and 20
Revision 19 as of 2019-07-05 14:32:24
Size: 1326
Comment:
Revision 20 as of 2019-07-05 14:34:12
Size: 1332
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
7/5 SNR threshold is lowered during 0am-8am.  *7/5 SNR threshold is lowered during 0am-8am.
Line 11: Line 11:
7/5 Missing plot for PEM trigger channel is fixed.  *7/5 Missing plot for PEM trigger channel is fixed.
Line 13: Line 13:
7/4 ER events are reprocessed.  *7/4 ER events are reprocessed.

GlitchPlot

This project is for glitch study. You can see the result on Yuzu Summary.

Recent update

  • 7/5 SNR threshold is lowered during 0am-8am.
  • 7/5 Missing plot for PEM trigger channel is fixed.
  • 7/4 ER events are reprocessed.

Old information is more below.

The latest trigger channel list

6/12~

Channel

SNR threshold (8:00~24:00)

SNR threshold (0:00~8:00)

IMC_CAV_TRANS_OUT_DQ

100

15

PSL_PMC_TRANS_DC_OUT_DQ

PEM_ACC_MCF_TABLE_REFL_Z_OUT_DQ

PEM_ACC_PSL_PERI_PSL1_Y_OUT_DQ

PEM_MIC_PSL_TABLE_PSL4_Z_OUT_DQ

Old information is more below.

Overview

xxx

Info

== Trigger channel list log== 6/12~ IMC_CAV_TRANS_OUT_DQ PSL_PMC_TRANS_DC_OUT_DQ PEM_ACC_MCF_TABLE_REFL_Z_OUT_DQ PEM_ACC_PSL_PERI_PSL1_Y_OUT_DQ PEM_MIC_PSL_TABLE_PSL4_Z_OUT_DQ

6/7~6/12 LSC_CARM_SERVO_MIXER_DAQ_OUT_DQ IMC_SERVO_SLOW_DAQ_OUT_DQ AOS_TMSX_IR_PD_OUT_DQ IMC_CAV_TRANS_OUT_DQ PSL_PMC_TRANS_DC_OUT_DQ

Update log

7/5 SNR threshold is lowered during 0am-8am. 7/5 Missing plot for PEM trigger channel is fixed. 7/4 ER events are reprocessed.

#

#xxx #

KAGRA/Subgroups/DET/GlitchPlot (last edited 2020-12-16 18:00:59 by chihiro.kozakai)