Line 10: | Line 10: |
* 8/19 Acceptance check BS~SRM * X/XX Acceptance check interferometer PR3-SR3 |
|
Line 11: | Line 13: |
* 8/13 - 8/19 Acceptance check BS~SRM | |
Line 14: | Line 15: |
* ?? Acceptance check IMC~PRM | * Y/YY Acceptance check IMC~PRM |
Line 17: | Line 18: |
* Some delay from * Beam dump around IFI * SR3, SRM mid-size baffle final check |
|
Line 23: | Line 20: |
* End X IM 83K * Suspension check with cryogenic temperature |
* End X IM 81K * Monitor, eigen-frequency, transfer function check |
Line 26: | Line 23: |
* Investigation of the TMSX beam shape | |
Line 31: | Line 27: |
* IY cooling : This week * Center area commissioning * Mid-size baffle SRM : Partially done, need to move to final position * Study for installation of the new laser * Set inside the PSL room * Chiller problem * REFL table investigation * Check power budget |
* Installed the ion pums to IXC and IYC * IY duct shield cooling (8/5- Started) |
Line 47: | Line 33: |
* Temperature monitor | |
Line 49: | Line 36: |
* Just started the investigation | * ALS CARM/DARM lock succeeded * Calibration confirmation * Transfer function measurement Type-A suspension * Noise budget * MICH 3f lock * Actuation efficiency measurement * Discussion of closing center area * Oplev pylon * Beam duct re-installation * New gate valve * Closing chambers around BS area |
Line 62: | Line 61: |
* Main IR * ALS |
* MICH 3f lock * Check the lock information * ALS CARM/DARM * Check the lock information |
Line 73: | Line 76: |
KAGRA Commissioning status at DET meeting
- Date : 2022/08/08
Overall schedule
- Overall schedule
- 7/11 - 8/12 Suspension commissioning Type-B
- 8/5 Acceptance check PRM, PR2, PR3 suspensions
- 8/19 Acceptance check BS~SRM
- X/XX Acceptance check interferometer PR3-SR3
- 8/22 - 8/26 Closing the center area PRM~PR2
- 8/29 - 9/2 Closing the center area BS~SRM
- 9/5 - 9/9 Leak test
- Y/YY Acceptance check IMC~PRM
Progress of commissioning
- X arm commissioning
- End X IM 81K
- Monitor, eigen-frequency, transfer function check
- Investigation of the noise in the new oplev light source
- Investigation of the ADC noise
- End X IM 81K
- Y arm commissioning
- Pumping down ongoing
- Installed the ion pums to IXC and IYC
- IY duct shield cooling (8/5- Started)
- Beam dump around IFI
- Many ghost beam
- beam dumper from reflection beam of the PRM
- Temperature monitor
- ALS CARM/DARM
- ALS CARM/DARM lock succeeded
- Calibration confirmation
- Transfer function measurement Type-A suspension
- Noise budget
- MICH 3f lock
- Actuation efficiency measurement
- Discussion of closing center area
- Oplev pylon
- Beam duct re-installation
- New gate valve
- Closing chambers around BS area
Interesting data
- X arm cavity
- Both IR and GR
- Glitch investigation of the ITMX ADC
- Glitch investigation of the MN oplev light source
- Y arm commissioning
- Both IR and GR
- Center area commissioning
- MICH 3f lock
- Check the lock information
- ALS CARM/DARM
- Check the lock information
- IMC (Input Mode Cleaner)
- ASC (Alignment Sensing and Control) done
- Long term stability check
- Beam power, beam position, oplev monitoring
- Glitch investigation
- Temperature dependence
- Relationship between PSL room
- With PEM channels
- (Hammering test?)
- OMC
- Invesigation will continue after closing the center area
- Because the BS is too fluctuate, it became difficult to investigate
- MICH 3f lock