* 221109 * Overall schedule * All leak test at center area was performed * OMC : In air, finalize will be performed this week. * 22nd Nov: Close chamber, start pumping down * TMSY : In vac, leak test done, opened the gate valve after 15th Nov. * ETMY cooling down will start from 15th Nov. * Interferometer overall * Initial alignment experiment * 16:00- everyday * PRMI lock trial * Search the good alignment * ADS engaged and alignment of the IMMT1,2 and PRM * FPMI lock succeeded * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17) * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]] * Calibration evaluation * Control filter optimization * Interferometer characterization * X arm commissioning * End X IM 85K * We will start the noise budget of the new oplev again * OMC ASC using the Xend test mass * Signal was detected in OMC PD * Y arm commissioning * IY duct shield cooling * New high power laser * PMC locked * ISS * Control loop done * Characterization is ongoing * ASC preparation * Sensing matrix measurements