⇤ ← Revision 1 as of 2022-12-14 07:28:04
Size: 1451
Comment:
|
Size: 1205
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
* 221207 | * 221214 |
Line 4: | Line 4: |
* All leak test at center area was performed * OMC : on 22 Nov, closed chamber, started pumping down [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23002|klog#23002]] * but, small leak was found [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23024|klog#23024]] * TMSY : In vac, leak test done, opened the gate valve after 15th Nov. * ETMY cooling down will start from 29th Nov. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23078|klog#23078]] |
* FPMI lock * PRFPMI lock trial * ALS noise hunting * ASC implementation * OMC status * Suspension commissioning * ISS/High power laser |
Line 10: | Line 12: |
* Interferometer overall * Initial alignment experiment * 16:00- everyday (sometimes 11:00-) |
* FPMI lock * Lock enable * Trial for DC readout with ISS control |
Line 14: | Line 16: |
* PRMI lock trial * Search the good alignment * ADS engaged and alignment of the IMMT1,2 and PRM |
* PRFPMI lock trial * PRMI lock stable * Establish the initial alignment * Bottle neck is the noise level of ALS * It made difficult to hand over from GR to IR |
Line 18: | Line 22: |
* FPMI lock succeeded * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17) * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]] * Calibration evaluation * Control filter optimization * Interferometer characterization |
* ALS noise hunting * We found ondotori was one of the noise which made twin glitch * 0.4 Hz unknown peak |
Line 25: | Line 26: |
* X arm commissioning * End X IM 85K * EY duct shield cooling ~250 K * We will start the noise budget of the new oplev again * OMC ASC using the Xend test mass * Signal was detected in OMC PD |
* ASC implementation * Evaluate offset map * Trial of the implementation of the ASC loop |
Line 32: | Line 30: |
* Y arm commissioning * IY duct shield cooling ~250 K * EY duct shield cooling (11/29~) |
* OMC status * Pumping down : ongoing * We succeeded to lock the OMC LSC and ASC * Implemented the OMC ASC using beacom from the ETMX drum head mode |
Line 36: | Line 35: |
* New high power laser * PMC locked * ISS * Control loop done * Characterization is ongoing |
* Suspension commissioning * Check the long term stability of the suspensions with the control loop for the observation mode * Investigating the ACC, geophone, seismometer and LVDT for reducing the low frequency fluctuation |
Line 43: | Line 39: |
* ASC preparation * Sensing matrix measurements |
* ISS/High power laser * ISS characterization is ongoing * High power laser : Check the stability of IMC LSC lock |
- 221214
- Overall schedule
- FPMI lock
- PRFPMI lock trial
- ALS noise hunting
- ASC implementation
- OMC status
- Suspension commissioning
- ISS/High power laser
- FPMI lock
- Lock enable
- Trial for DC readout with ISS control
- PRFPMI lock trial
- PRMI lock stable
- Establish the initial alignment
- Bottle neck is the noise level of ALS
- It made difficult to hand over from GR to IR
- ALS noise hunting
- We found ondotori was one of the noise which made twin glitch
- 0.4 Hz unknown peak
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
- OMC status
- Pumping down : ongoing
- We succeeded to lock the OMC LSC and ASC
- Implemented the OMC ASC using beacom from the ETMX drum head mode
- Suspension commissioning
- Check the long term stability of the suspensions with the control loop for the observation mode
- Investigating the ACC, geophone, seismometer and LVDT for reducing the low frequency fluctuation
- ISS/High power laser
- ISS characterization is ongoing
- High power laser : Check the stability of IMC LSC lock