Differences between revisions 1 and 2
Revision 1 as of 2023-01-20 12:16:02
Size: 912
Comment:
Revision 2 as of 2023-01-25 09:43:19
Size: 1114
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 * Summary
  * No special difference from last week
  * PRFPMI trial is ongoing
   * Today, we will install the GR PNC system, it became stronger for large micro-seismic motion
  * Heavy snow...
  • Summary
    • No special difference from last week
    • PRFPMI trial is ongoing
      • Today, we will install the GR PNC system, it became stronger for large micro-seismic motion
    • Heavy snow...
  • Site work
    • 1/30 - 2/3 Repair the leak at OMC area
    • PLL with new laser
  • FPMI lock
    • Lock enable
    • Silent run sometimes performed
      • 2022/12/28 evening - 2023/01/14 morning klog23463

      • Overnight
    • FPMI with DC readout and ISS locked
  • PRFPMI lock trial
    • PRMI lock stable
    • Establish the initial alignment
    • Bottle neck is the noise level of ALS
      • It made difficult to hand over from GR to IR
        • How to brand for hand over
      • Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak
        • In vac optical table and put the steering mirror on it
      • Reducing the air disturbance
  • ASC implementation
    • Evaluate offset map
    • Trial of the implementation of the ASC loop

KAGRA/Subgroups/DET/Meeting/230125 (last edited 2023-01-25 09:43:19 by TakaakiYokozawa)