⇤ ← Revision 1 as of 2023-02-01 07:16:43
Size: 980
Comment:
|
← Revision 2 as of 2023-02-01 07:18:50 ⇥
Size: 656
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* Lock continued more than 2 hours * PRFPMI with DC readout ongoing |
|
Line 16: | Line 18: |
* PRFPMI lock trial * PRMI lock stable * Establish the initial alignment * Bottle neck is the noise level of ALS * It made difficult to hand over from GR to IR * How to brand for hand over * Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak * In vac optical table and put the steering mirror on it * Reducing the air disturbance |
- Summary
- PRFPMI with TRAS lock succeeded
- Lock continued more than 2 hours
- PRFPMI with DC readout ongoing
- PRFPMI with TRAS lock succeeded
- Site work
- 1/30 - 2/3 Repair the leak at OMC area : Ongoing
- PLL with new laser : Done
- FPMI lock
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop