== Status of the KAGRA commissioning 230510 == * Status * Sensitivity 1.2 -1.4 Mpc * From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement * Effect of earthquake at Noto peninsula * 5th May : Magnitude 6.7 at Noto peninsula * Several earthquakes are still happened * Interferometer is already recovered * Re-alignment at PSL room will be performed today * Commissioning work * Alignment sensing and controls * We need the PR3 global control to keep the stable opleration * Trial is ongoing * If trial is not succeeded until the O4a, we will sometimes perform manual alignment * OMC alignment control problem * Fixing is ongoing * If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting * Tapping test and shaker injection * We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14941|Result(JGWDoc14941)]] * OMC chamber is most sensitive part, we performed the shaker injection test * Analysis is ongoing * Increasing the laser power * Toward the stable operation is higher priority, so if possible we will try to increase the laser power * Glitch investigation * ETMY oplev glitch * Solved by install the temperature control system * ITMY suspension glitch * Try to install the IR/GR filter in front of oplev QPD * IPC glitch * It sometimes happened that the time series sometimes jump during observation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24930|example(klog24930)]] * Trial of slim down the real time model * Trial the glitch reason by Sawada-san * 37 Hz glitch * It detected in OMC signal [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=25106|klog25106]] * 37 Hz and its harmonics frequency excited * Seeing in hveto analysis(?) * The reason is not understand yet * Lock loss investigation * Ongoing