Differences between revisions 1 and 22 (spanning 21 versions)
Revision 1 as of 2018-01-22 23:52:10
Size: 1385
Editor: KojiNagano
Comment:
Revision 22 as of 2018-01-23 15:06:37
Size: 2504
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
/* Hayama, K. Nagano, Shimoda, Hasegawa, Tanioka, Pil-Jong, Miyo, S. H. Oh, Ogawa, Son, H. Tanaka, J. J. Oh, Y. M. Kim */ Hayama, K. Nagano, Shimoda, Miyazaki, Pil-Jong, H. Tanaka, Shaun
Line 13: Line 13:
  * Experiment after bKAGRA phase1 run will be start around the end of April (on Apr. 30th??).
  * 5th and 6th day will be assigned to PEM injection?
  * Experiment after bKAGRA phase1 run will start around the end of April (on Apr. 30th).
  * 5th and 6th day will be assigned to PEM injection (If the bKAGRA phase1 run finish on Apr. 29th, they are May 4th and 5th.)

 * Recent news
  * In bKAGRA phase 1 run, only ETM'''Y''' will be cryogenic. ETM'''X''' will not be cooled down.
  * Following this, how about changing our plan: Injection will be perform in ETM'''Y''' although original plan is ETM'''X'''.
  * Problems
   * Rack
   * TMSとの調整。
Line 20: Line 27:
  * Miyazaki-kun, who is a new grad. student of Ando lab., has started mede analog circuit for magnetometer.   * Miyazaki-kun, who is a new grad. student of Ando lab., has started to make analog circuits for magnetometer.
Line 24: Line 31:
   * Maybe we will make it in Kamioka in the first day of the rehearsal. Or will anyone come to Ochi-kun's master thesis defense and take the pins?    * Maybe we will make it in Kamioka on the first day of the rehearsal. Or will anyone who come to Tokyo (e.g. Ochi-kun's master thesis defense) kindly take the pins?

 * Progress report from Kamioka
  * Rack preparation.
   * IMC0:
   * IYC:
   * EY0:
   * EY1:
   * By the way, do we have a conversion board for ADC to D-sub from BNC?
  * Software preparation (Pil-Jong)
   * Python environment has been installed to k1det1 successfully.
   * How to use: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/gwpy]]
   * Completed.
  * Anything else?

 * Communication tool for the PEM injection: Slack (Miyo)

 * github for management of the PEM project (Miyo)
  * Can we perform project management only with pure github like this? (Nagano)
  * Is it necessary to do this under detchar repository? (Nagano)
Line 27: Line 53:
 * 入っていないメンバーをslackに招待する。
 * githubのアカウントを取っていない人は取る。
Line 30: Line 57:
 /* 2018/01/30 13:00-- Detchar meeting */  2018/01/30 13:00-- Detchar meeting

Detchar Meeting 20180123

Participants

Hayama, K. Nagano, Shimoda, Miyazaki, Pil-Jong, H. Tanaka, Shaun


Agenda & Minutes

See also http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Meet/Agenda20180123

  • Report from Extended Chief meeting on Jan. 22nd (Hayama)
    • Experiment after bKAGRA phase1 run will start around the end of April (on Apr. 30th).
    • 5th and 6th day will be assigned to PEM injection (If the bKAGRA phase1 run finish on Apr. 29th, they are May 4th and 5th.)
  • Recent news
    • In bKAGRA phase 1 run, only ETMY will be cryogenic. ETMX will not be cooled down.

    • Following this, how about changing our plan: Injection will be perform in ETMY although original plan is ETMX.

    • Problems
      • Rack
      • TMSとの調整。
  • Progress report from Hongo
    • Calibration of the toy pendulum system (injection target in rehearsal) has beed done.
    • We checked two demo-unit of small accelerometer (FG-142 and 2002E).
      • We will buy FG-142 in next fiscal year.
    • Miyazaki-kun, who is a new grad. student of Ando lab., has started to make analog circuits for magnetometer.
    • Magnet wire for large coil (~100 m) arrived. Large wooden bobbin will arrive in the end of Jan. (or the beginning of Feb.)
    • Connector parts for amplifier (QSC RMX5050a) arrived.
    • We obtained power supply connector used in KAGRA. However, we don't have pins.
      • Maybe we will make it in Kamioka on the first day of the rehearsal. Or will anyone who come to Tokyo (e.g. Ochi-kun's master thesis defense) kindly take the pins?
  • Progress report from Kamioka
  • Communication tool for the PEM injection: Slack (Miyo)
  • github for management of the PEM project (Miyo)
    • Can we perform project management only with pure github like this? (Nagano)
    • Is it necessary to do this under detchar repository? (Nagano)

Action items

  • 入っていないメンバーをslackに招待する。
  • githubのアカウントを取っていない人は取る。

Next meeting

  • 2018/01/30 13:00-- Detchar meeting

KAGRA/Subgroups/DET/PEMinjection/bKAGRA-phase1/meeting_20180123 (last edited 2018-01-23 18:30:55 by KojiNagano)