Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2018-01-22 23:52:10
Size: 1385
Editor: KojiNagano
Comment:
Revision 3 as of 2018-01-23 00:05:01
Size: 1821
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
  * Any thing else?
Line 25: Line 26:
  * Any thing else?

 * Progress report from Kamioka
  * Rack preparation. (Miyo)
   * By the way, do we have a conversion board for ADC to D-sub from BNC?
  * Software preparation (Pil-Jong)
  * Any thing else?

 * Communication tool for the PEM injection: Slack (Miyo)

 * github for management of the PEM project (Miyo)
  * Can we perform project management only with pure github like this? (Nagano)

Detchar Meeting 20180123

Participants


Agenda & Minutes

See also http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Meet/Agenda20180123

  • Report from Extended Chief meeting on Jan. 22nd (Hayama)
    • Experiment after bKAGRA phase1 run will be start around the end of April (on Apr. 30th??).
    • 5th and 6th day will be assigned to PEM injection?
    • Any thing else?
  • Progress report from Hongo
    • Calibration of the toy pendulum system (injection target in rehearsal) has beed done.
    • We checked two demo-unit of small accelerometer (FG-142 and 2002E).
      • We will buy FG-142 in next fiscal year.
    • Miyazaki-kun, who is a new grad. student of Ando lab., has started mede analog circuit for magnetometer.
    • Magnet wire for large coil (~100 m) arrived. Large wooden bobbin will arrive in the end of Jan. (or the beginning of Feb.)
    • Connector parts for amplifier (QSC RMX5050a) arrived.
    • We obtained power supply connector used in KAGRA. However, we don't have pins.
      • Maybe we will make it in Kamioka in the first day of the rehearsal. Or will anyone come to Ochi-kun's master thesis defense and take the pins?
    • Any thing else?
  • Progress report from Kamioka
    • Rack preparation. (Miyo)
      • By the way, do we have a conversion board for ADC to D-sub from BNC?
    • Software preparation (Pil-Jong)
    • Any thing else?
  • Communication tool for the PEM injection: Slack (Miyo)
  • github for management of the PEM project (Miyo)
    • Can we perform project management only with pure github like this? (Nagano)

Action items

Next meeting

KAGRA/Subgroups/DET/PEMinjection/bKAGRA-phase1/meeting_20180123 (last edited 2018-01-23 18:30:55 by KojiNagano)