Differences between revisions 46 and 49 (spanning 3 versions)
Revision 46 as of 2017-12-27 18:12:33
Size: 10499
Comment:
Revision 49 as of 2017-12-28 01:33:55
Size: 10814
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 69: Line 69:
||Function generator ||1 ||Not known ||No? ||No ||Yes? ||N/A || || ||Function generator ||1 ||AFG3022C ||No? ||No ||Yes ||N/A || ||
Line 89: Line 89:
||Small magnetometer ||1 ||Mag649 ||No ||No ||Yes ||N/A ||Ando lab's instrument || ||Small magnetometer ||1 ||Mag649 ||No ||No ||Yes ||N/A ||[[https://granite.phys.s.u-tokyo.ac.jp/wiki/Lab/index.php?AndoLabInstrumentsMag649|Ando lab's instrument]] ||
Line 96: Line 96:
||Mallet ||1 ||Not known ||No ||No ||Yes ||N/A || || ||Mallet ||1 ||Not known ||No ||Yes ||Yes ||N/A || ||
Line 114: Line 114:

== Calibration ==
 * ADC: (for single-ended sensors) 20/2^15^ V/count, (for differential sensors) 10/2^15^ V/count
  * input impedance 10 kΩ
 * Magnetometer (Mag649; Range +/-100 uT): 30 mV/uT? (impedance should be checked)

PEM injection in bKAGRA phase1

(Description will be translated to English at some point)

Aims

In bKAGRA phase1,

  • Investigate the projection of the environmental noise effect to the sensitivity of KAGRA interferometer
  • Characterize the effect of the scattering light
  • Morphologically study the environmental noise waveform

(bKAGRA phase1 における、

  • 干渉計感度への環境雑音の影響のプロジェクション
  • 散乱光のキャラクタリゼーション
  • 雑音の形態学的スタディ)

Injection types

  • Acoustic injection (AcI)
  • Magnetic injection (MaI)
  • Shaking injection (ShI)

What we want to do

Necessary

  • Measuring coupling functions between environmental noise and interferometer signal
  • Measuring environmental noise using several sensors
  • Spectrogram of the interferometer signal during injection

If possible

  • Narrow down coupling locations
  • Narrow down environmental noise source locations
  • Switch off test
  • Identify line noise sources
  • RF noise measurement around RF modulation sideband frequencies.

Candidates of measurement points

  • PSL
  • IMC (mirrors, refl table)
  • IFI
  • PRM
  • BS
  • ETMX/Y (1F,2F)
  • TMS (both end)
  • WAB
  • Arms

(including racks of each points for control and DAQ.)

Schedule

(VERY ROUGH)

  • 2017/12/06 Project started
  • 2017/12/26 Rehearsal of rehearsal
  • Before bKAGRA phase1 run (Detailed date has not been fixed): Preparation
  • 2018/02/0X: Rehearsal of PEM injection (end-to-end test, maybe without actual injection)
  • After bKAGRA phase1 run (Detailed date has not been fixed): Injection test in tunnel (4 days)
  • After injection test: Analysis, make report, (if possible) write paper

Sensors and instruments information

Common

Items

Numbers

Part Number

Need to order

Ordered

We have

JGW S-number

Comment

Amplifier

1

QSC RMX5050a

No

No

Yes

N/A

Head set

several

Not known

Need

No

No

N/A

Small accelerometer

several

KISTLER Accelerometer Type 8640A5

No

No

Yes

List,S1707218,7219,7221,7222

Laser accelerometer

1

Not known

No

No

Yes?

N/A

RION

Clay(?) to fix accelerometer

a few

Not known

No

No

Yes?

N/A

Cables and connectors

many

Not known

Partially need?

No

Partially no?

N/A

Low noise filter

1

Not known

Need

No

No

N/A

Like SR560. Hand made?

Function generator

1

AFG3022C

No?

No

Yes

N/A

Acoustic injection

Items

Numbers

Part Number

Need to order

Ordered

We have

JGW S-number

Comment

Large speaker

2

JBL JRX212

No

No

Yes

N/A

URL

Small speaker (PZT)

1

Not known

Need

No

No

N/A

(If possible)

Microphone

1

B&K 4188 + 2671(case) + 1704(pre-amp)

No

No

Yes

N/A

MIcrophone2

2

AT-VD6 + AT-MA2(amp)

No

No

Yes

N/A

Seismometer

1

Trillium compact 120-SV1

No

No

Yes

S1707526

Earplug

several

Not known

Need

No

No

N/A

(example)

Rubber stack

8

Not known

Need

No

No

N/A

(If possible. For example, KE-25 (Misumi).)

Horn

1

Not known

Need

No

No

N/A

Magnetic injection

Items

Numbers

Part Number

Need to order

Ordered

We have

JGW S-number

Comment

Large Coil

2

Not known

Need

No

No

N/A

a few Ohms, ~1 m dia.

Small Coil

1

Not known

Need

No

No

N/A

(If possible)

Magnetometer

2

Mag-13MCL +amplifier

No

No

Yes

S1707535,7536,7537,7538,7539,S1707540(Amp)

URL (pdf)

Small magnetometer

1

Mag649

No

No

Yes

N/A

Ando lab's instrument

Shaker injection

Items

Numbers

Part Number

Need to order

Ordered

We have

JGW S-number

Comment

Large Magnet coil shaker

1

Not known

No

No

Yes

N/A

NAOJ

Small PZT shaker

a few

Not known

Need

No

No

N/A

Mallet

1

Not known

No

Yes

Yes

N/A

Others

Items

Numbers

Part Number

Need to order

Ordered

We have

JGW S-number

Comment

RF antenna

2

Not known

Need

No

No

N/A

Could be made ourselves?

RF signal amplifier

2

Not known

Need

No

No

N/A

Could be made ourselves?

RF generator

1

Not known

Need

No

No

N/A

(If possible. Can Moku:Lab be used?)

RF spectrum analyzer

1

Not known

No

No

Yes

N/A

Moku:Lab

To be prepared

  • CDS (Real time model, DAC, ADC, DQ)
  • Calibration (Sensors, DAC, ADC)
    • ADCの入力インピーダンスは10 kΩ (ref. JGW-T1200779 or Shoda-san's PhD thesis.)

  • Analysis code to calculate coupling function (peaks, comb, broad)
  • Spectrogram tools
  • MEDM

Calibration

  • ADC: (for single-ended sensors) 20/215 V/count, (for differential sensors) 10/215 V/count

    • input impedance 10 kΩ
  • Magnetometer (Mag649; Range +/-100 uT): 30 mV/uT? (impedance should be checked)

Number of usable channel for each rack

★ 最低限なにかしらのDAQがほしい場所

  1. MC、PRエリア(IMC0ラックに寄生?)
  2. BS、SRエリア(PR2ラックに寄生?+追加のADCはここ)
  3. IXCエリア(WABラックに寄生?)
  4. IYCエリア(WABラックに寄生?)
  5. EXCエリア(???誰)
  6. EYCエリア(???誰)
  7. IXVエリア(TypeAラック、CryoP?)
  8. IYVエリア(TypeAラック、CryoP?)
  9. EXVエリア(TypeAラック、CryoP?)
  10. EYVエリア(TypeAラック、CryoP?)
  11. Xアーム (PX1ラックに寄生?)
    • BNCの配線を考えると、コレぐらいのエリアが最低限で現実的。
    • 最初はざっくり10枚ADCがほしいとリクエストしてみましたが、無理でした。

(Part of) to do list

  • Obtain S/N on JGWdoc for all PEM related things, e.g. sensors, actuators, amplifiers, non-standard cables.
  • Calibrate sensors and actuators.
    • Consider how to calibrate them.
  • Consider how to connect all instruments.
    • Ground problem. (各実験エリア(特にエンド)でのグラウンドの確認。)
  • Make analysis codes --> Hayama, Pil-jong

  • Gather all required instruments listed in above tables.
  • 持っている機器、買う必要がある機器の確認し、見積りを取る。-->長野

  • 小さい加振機の検討。
  • アナログ回路(~10 kHzの早いインジェクション用)を作る。
  • 各エリアで確保できるデジタルのチャンネル数の確認。--> EXC: 端山、EXV: 端山、IMC0: 三代、BS: OK

  • 確保できるチャンネル数の中で、やること/できることを具体化する。
  • 山本さんにCALで似たようなコードを作ってないか確認する。
  • 予行演習・本番測定の人手の確保。
  • センサー・アクチュエータ類のキャリブレーション。
    • 主にコイル(他はマニュアルを信じる) --> 長野

  • 磁束計のセットアップ --> 田中

  • ラックの状況をまとめる --> 三代

  • ホワイトニングフィルターの確保 --> 端山

  • 加振機の確保 --> 三代・端山

  • コイルの作製 --> 長野

  • 磁束計の検討 --> 長野

  • 既存のセンサー・アクチュエータのリスト化 --> 端山(シフトコール)

  • MEDM画面の作成
    • フィルターバンクに各センサーのキャリブレーションファクターを入れておく。
    • イメージはこんな感じ。MEDMdesign_PEMinjectionVer2.png

  • エンドでの作業手順(2階へのものの搬入、クリーンブース内の中2階へのアクセス方法等)をTypeAチームに相談する。

Results

Meetings

Next meeting is 2017/12/28 14:00 リハーサルのリハーサルの反省会

What has been done

  • Consider how many DAC, ADC, CH are required at each measurement point.
  • 大きい加振機の所在を麻生さんに確認。
  • Differential input/output of CDS. (CDSの差動入出力への対応。)
  • Consider how many people are required.
  • 解析コードを作る人手を確保。

KAGRA/Subgroups/DET/PEMinjection/bKAGRA-phase1 (last edited 2018-07-11 20:03:44 by KojiNagano)