Differences between revisions 11 and 12
Revision 11 as of 2018-01-21 23:58:28
Size: 2176
Editor: KojiNagano
Comment:
Revision 12 as of 2018-01-23 15:13:01
Size: 2320
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

== Management tool ==
github: [[https://github.com/gw-analysis/detector-characterization/projects/1?]]

== Communication tool ==
Slack

Physical and Environmental Monitor injection

Project description

Physical and Environmental Monitor (PEM) injection is a way to identify environmental noise sources by intentionally injecting them, such as vibrations, large sound or electromagnetic waves.

Management tool

github: https://github.com/gw-analysis/detector-characterization/projects/1?

Communication tool

Slack

Schedule

bKAGRA phase1

KAGRA/Subgroups/DET/PEMinjection (last edited 2018-06-14 13:34:06 by KojiNagano)