Differences between revisions 11 and 13 (spanning 2 versions)
Revision 11 as of 2018-01-21 23:58:28
Size: 2176
Editor: KojiNagano
Comment:
Revision 13 as of 2018-01-23 16:31:28
Size: 2516
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

== Management tool ==
github: [[https://github.com/gw-analysis/detector-characterization/projects/1?]]

Usage will be summarized soon.

== Communication tool ==
We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Physical and Environmental Monitor injection

Project description

Physical and Environmental Monitor (PEM) injection is a way to identify environmental noise sources by intentionally injecting them, such as vibrations, large sound or electromagnetic waves.

Management tool

github: https://github.com/gw-analysis/detector-characterization/projects/1?

Usage will be summarized soon.

Communication tool

We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Schedule

bKAGRA phase1

KAGRA/Subgroups/DET/PEMinjection (last edited 2018-06-14 13:34:06 by KojiNagano)