Differences between revisions 12 and 13
Revision 12 as of 2018-01-23 15:13:01
Size: 2320
Editor: KojiNagano
Comment:
Revision 13 as of 2018-01-23 16:31:28
Size: 2516
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
Usage will be summarized soon.
Line 10: Line 12:
Slack We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Physical and Environmental Monitor injection

Project description

Physical and Environmental Monitor (PEM) injection is a way to identify environmental noise sources by intentionally injecting them, such as vibrations, large sound or electromagnetic waves.

Management tool

github: https://github.com/gw-analysis/detector-characterization/projects/1?

Usage will be summarized soon.

Communication tool

We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Schedule

bKAGRA phase1

KAGRA/Subgroups/DET/PEMinjection (last edited 2018-06-14 13:34:06 by KojiNagano)