Differences between revisions 17 and 18
Revision 17 as of 2018-01-27 13:56:08
Size: 2907
Editor: KojiNagano
Comment:
Revision 18 as of 2018-03-14 10:43:10
Size: 3072
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:

== Internal ==
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/PEMinjection/internal|Internal page (paper plan, confidential docs, and so on)]]

Physical and Environmental Monitor injection

Project description

Physical and Environmental Monitor (PEM) injection is a way to identify environmental noise sources by intentionally injecting them, such as vibrations, large sound or electromagnetic waves.

Management tool

github: https://github.com/gw-analysis/detector-characterization/projects/1?

Usage will be summarized soon. How to use github project (Under construction)

Communication tool

We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Schedule

bKAGRA phase1

Internal

Internal page (paper plan, confidential docs, and so on)

KAGRA/Subgroups/DET/PEMinjection (last edited 2018-06-14 13:34:06 by KojiNagano)