Differences between revisions 18 and 19
Revision 18 as of 2018-03-14 10:43:10
Size: 3072
Editor: KojiNagano
Comment:
Revision 19 as of 2018-04-03 22:52:32
Size: 3116
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 55: Line 55:
 * LIGO PEM page
 [[http://pem.ligo.org]]

Physical and Environmental Monitor injection

Project description

Physical and Environmental Monitor (PEM) injection is a way to identify environmental noise sources by intentionally injecting them, such as vibrations, large sound or electromagnetic waves.

Management tool

github: https://github.com/gw-analysis/detector-characterization/projects/1?

Usage will be summarized soon. How to use github project (Under construction)

Communication tool

We are using Slack. If you are interested in PEM injection and want to join our Slack workspace, please don't hesitate to contact any person of the PEM injection team.

Schedule

bKAGRA phase1

Internal

Internal page (paper plan, confidential docs, and so on)

KAGRA/Subgroups/DET/PEMinjection (last edited 2018-06-14 13:34:06 by KojiNagano)