Size: 1271
Comment:
|
Size: 1283
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
<<TableOfContents(2)>> | |
Line 2: | Line 3: |
<<TableOfContents(2)>> |
== O3 run == |
Task list
O3 run
# |
Item |
ER 6/8 |
ER 6/xx |
1 |
Gritch trigger generation for main IFO signal |
< |
|
2 |
Glitch visualization for main IFO signal |
< |
|
3 |
Coincidence search with environmental channels |
|
|
4 |
Preparing Glitch database |
|
|
5 |
Line visualization for main IFO signal |
< |
|
6 |
Investigating peak frequency and source of noise |
< |
|
7 |
Preparing Line database |
|
|
8 |
Providing online data quality flag |
< |
|
9 |
Providing data quality category |
|
|
10 |
Merging data quality category with proc. data |
|
|
11 |
Providing data quality report (DQR) |
|
|
12 |
Sharing DQR with LV |
|
|
13 |
Preparing daily(?) check items |
|
|
14 |
Preparing a manual of DetChar tools |
|
|
15 |
Preparing a trouble shooting manual |
|
|