Differences between revisions 1 and 14 (spanning 13 versions)
Revision 1 as of 2016-07-30 18:15:34
Size: 82
Comment:
Revision 14 as of 2016-10-31 19:51:49
Size: 1304
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
KAGRA/Subgroups/DET/armEnvMonについて、ここに記述してください。 == Aim ==
To monitor the tunnel environment except the center and end ares.

== Construction ==
 1. Sensor (Raspberry Pi 3 based + EPICS)
 2. Monitor map system (software: EPICS based?)

== Monitor map ==
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
 1. Temperature (SHT-25)
 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025
 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure
 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi
 5. Water-proof Camera

== How many? ==
Every 200 m, we put the sensor. The estimated number of the sensors is 30.

== Special Meeting ==
[[Meeting Information|attachment:meeting_miyo_yamamoto.txt]]

== Schedule ==
|| October 2016 || Test the sensors at IMS (#3) w Preliminary sensor ||
|| November 2016 || First trial sensors from IMS to Kamioka (#3) w Preliminary sensor ||
|| December 2016 || Adjustment / EPICS developmenet ||
|| January 2017 || Building up all sensors is started. ||
|| February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ ||
|| March 2017 || Install start at Kamioka ||
|| May 2017 || Install end at Kamioka ||

Aim

To monitor the tunnel environment except the center and end ares.

Construction

  1. Sensor (Raspberry Pi 3 based + EPICS)
  2. Monitor map system (software: EPICS based?)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

  1. Temperature (SHT-25)
  2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025

  3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure

  4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi

  5. Water-proof Camera

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Special Meeting

attachment:meeting_miyo_yamamoto.txt

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Test at ESPEC https://www.espec.co.jp/products/trustee/

March 2017

Install start at Kamioka

May 2017

Install end at Kamioka

KAGRA/Subgroups/DET/armEnvMon (last edited 2017-01-16 23:41:09 by YutakaShikano)