82
Comment:
|
890
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
KAGRA/Subgroups/DET/armEnvMonについて、ここに記述してください。 | == Aim == To monitor the tunnel environment except the center and end ares. == Construction == 1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) == Monitor map == We should decide the required sampling rate and resolution. 1. Temperature 2. Humidity 3. Air pressure 4. Magnetic field 5. Wind speed / direction == How many? == Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30. == Budget == 500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences == Schedule == || September 2016 || Test the sensors at IMS (#3) || || October 2016 || Adjustment || || November 2016 || First trial sensors from IMS to Kamioka (#5) || || December 2016 || Adjustment || || January 2017 || All sensors will be installed at Kamioka. || |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution.
1. Temperature
2. Humidity
3. Air pressure
4. Magnetic field
5. Wind speed / direction
How many?
Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30.
Budget
500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences
Schedule
September 2016 |
Test the sensors at IMS (#3) |
October 2016 |
Adjustment |
November 2016 |
First trial sensors from IMS to Kamioka (#5) |
December 2016 |
Adjustment |
January 2017 |
All sensors will be installed at Kamioka. |