KAGRA/Subgroups/DET/armEnvMonについて、ここに記述してください。 | == Aim == To monitor the tunnel environment except the center and end ares. == Construction == 1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) == Monitor map == We should decide the required sampling rate and resolution. Target: 10 Hz sampling 1. Temperature (SHT-25) 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi 5. Wind speed / direction == How many? == Every 200 m, we put the sensor. The estimated number of the sensors is 30. == Budget == 500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences == Schedule == || October 2016 || Test the sensors at IMS (#3) || || November 2016 || First trial sensors from IMS to Kamioka (#5) / Preliminary sensor || || December 2016 || Adjustment / EPICS developmenet || || January 2017 || Building up all sensors is started. || || February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ || || March 2017 || Install at Kamioka || |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
1. Temperature (SHT-25)
2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025
3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure
4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi
5. Wind speed / direction
How many?
Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Budget
500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences
Schedule
October 2016 |
Test the sensors at IMS (#3) |
November 2016 |
First trial sensors from IMS to Kamioka (#5) / Preliminary sensor |
December 2016 |
Adjustment / EPICS developmenet |
January 2017 |
Building up all sensors is started. |
February 2017 |
Test at ESPEC https://www.espec.co.jp/products/trustee/ |
March 2017 |
Install at Kamioka |