1557
Comment:
|
1581
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) |
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) |
Line 10: | Line 10: |
1. Temperature (SHT-25) 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi 5. Camera http://mizna.hatenablog.com/entry/2014/11/17/171127 [[http://cubic9.com/Devel/%C5%C5%BB%D2%B9%A9%BA%EE/RaspberryPi/%A5%A6%A5%A7%A5%D6%A5%AB%A5%E1%A5%E9%A4%C7%A5%B9%A5%C8%A5%EA%A1%BC%A5%DF%A5%F3%A5%B0/|参考記事]] |
1. Temperature (SHT-25) 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi 5. Water-proof Camera [[http://mizna.hatenablog.com/entry/2014/11/17/171127|Set-up Ref. 1]] [[http://cubic9.com/Devel/%C5%C5%BB%D2%B9%A9%BA%EE/RaspberryPi/%A5%A6%A5%A7%A5%D6%A5%AB%A5%E1%A5%E9%A4%C7%A5%B9%A5%C8%A5%EA%A1%BC%A5%DF%A5%F3%A5%B0/|Set-up Ref. 2]] |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
- Sensor (Raspberry Pi 3 based + EPICS)
- Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
- Temperature (SHT-25)
Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025
Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure
Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi
Water-proof Camera Set-up Ref. 1 Set-up Ref. 2
How many?
Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Budget
500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences
Schedule
October 2016 |
Test the sensors at IMS (#3) w Preliminary sensor |
November 2016 |
First trial sensors from IMS to Kamioka (#3) w Preliminary sensor |
December 2016 |
Adjustment / EPICS developmenet |
January 2017 |
Building up all sensors is started. |
February 2017 |
Test at ESPEC https://www.espec.co.jp/products/trustee/ |
March 2017 |
Install start at Kamioka |
May 2017 |
Install end at Kamioka |