1581
Comment:
|
1395
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
1. Temperature (SHT-25) 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi 5. Water-proof Camera [[http://mizna.hatenablog.com/entry/2014/11/17/171127|Set-up Ref. 1]] [[http://cubic9.com/Devel/%C5%C5%BB%D2%B9%A9%BA%EE/RaspberryPi/%A5%A6%A5%A7%A5%D6%A5%AB%A5%E1%A5%E9%A4%C7%A5%B9%A5%C8%A5%EA%A1%BC%A5%DF%A5%F3%A5%B0/|Set-up Ref. 2]] |
1. Temperature ([[https://strawberry-linux.com/catalog/items?code=80025|SHT-25]]) 2. Humidity ([[https://strawberry-linux.com/catalog/items?code=80025|SHT-25]]) 3. Air pressure ([[http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure|BM1383GLV: Rohm]]) 4. Magnetic field ([[http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi&defaultGroupId=false|BM1422GMV: Rohm]]) 5. Water-proof Camera |
Line 19: | Line 19: |
== Budget == 500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences |
== Special Meeting == [[attachment:meeting_miyo_yamamoto.txt|Meeting Information]] |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
- Sensor (Raspberry Pi 3 based + EPICS)
- Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
Temperature (SHT-25)
Humidity (SHT-25)
Air pressure (BM1383GLV: Rohm)
Magnetic field (BM1422GMV: Rohm)
- Water-proof Camera
How many?
Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Special Meeting
Schedule
October 2016 |
Test the sensors at IMS (#3) w Preliminary sensor |
November 2016 |
First trial sensors from IMS to Kamioka (#3) w Preliminary sensor |
December 2016 |
Adjustment / EPICS developmenet |
January 2017 |
Building up all sensors is started. |
February 2017 |
Test at ESPEC https://www.espec.co.jp/products/trustee/ |
March 2017 |
Install start at Kamioka |
May 2017 |
Install end at Kamioka |