== Current Status ==
 1. Waiting for shipping the sensors. -> Implementation of sensors.
 2. Drawing the box for Raspeberry Pi and sensors
 3. Software: almost done. (database)
Line 13: Line 18:
 4. Magnetic field ([[http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi&defaultGroupId=false|BM1422GMV: Rohm]])
 5. Water-proof Camera
 4. Magnetic field ([[http://www.aichi-mi.com/topics/%E9%9B%BB%E5%AD%90%E3%82%B3%E3%83%B3%E3%83%91%E3%82%B9/ami306r%E3%82%B3%E3%83%B3%E3%83%91%E3%82%B9/|AMI306R: Aichi Steel]])
Line 18: Line 22:

Updated information: initial install number at the network point w/ wired LAN is 6 for each arm.
Line 26: Line 32:
||  January 2017 || Building up all sensors is started. ||
||  February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ ||
||  March 2017 || Install start at Kamioka ||
||  May 2017 || Install end at Kamioka ||
|| January 2017 || Building up all sensors is started. ||
|| February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ ||
|| March 2017 || Install start at Kamioka ||
|| May 2017 || Install end at Kamioka ||

Current Status

  1. Waiting for shipping the sensors. -> Implementation of sensors.

  2. Drawing the box for Raspeberry Pi and sensors
  3. Software: almost done. (database)

Aim

To monitor the tunnel environment except the center and end ares.

Construction

  1. Sensor (Raspberry Pi 3 based + EPICS)
  2. Monitor map system (software: EPICS based?)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

  1. Temperature (SHT-25)

  2. Humidity (SHT-25)

  3. Air pressure (BM1383GLV: Rohm)

  4. Magnetic field (AMI306R: Aichi Steel)

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Updated information: initial install number at the network point w/ wired LAN is 6 for each arm.

Special Meeting

Meeting Information w/ Miyo, Yamamoto, and Shikano on 10/27/2016

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Test at ESPEC https://www.espec.co.jp/products/trustee/

March 2017

Install start at Kamioka

May 2017

Install end at Kamioka