Line 2: Line 2:
 1. Waiting for shipping the sensors. -> Implementation of sensors.
 2. Drawing the box for Raspeberry Pi and sensors
 1. Sensors except for one sensor were received. -> Printed circuit board assembling will be started.
 2. Drawing the box for Raspeberry Pi and sensors -> We are waiting for the test box.
Line 5: Line 5:

== Not yet decided ==
 1. Power cable 3 m (Internal budget will be used.)
 2. LAN cable ?? m (10 m is enough?) (Which grant will be used?)
 3. IP issue (KAGRA DAQ IP system) At least 12 IPs for KAGRA DAQ network are required. Please negotiate this to Miyakawa-san.
 4. 12 Fiber Media Converters are required for installing. (Please check this to Miyoki-san? Miyakawa-san?)
 5. Installing rack or table. (Which grant will be used?) PCR-54WM [https://www.monotaro.com/g/01406700/]
Line 10: Line 17:
 1. Sensor (Raspberry Pi 3 based + EPICS)
 2. Monitor map system (software: EPICS based?)
 1. Sensor (Raspberry Pi 2B based + EPICS)
 2. Monitor map system (Not yet)
Line 33: Line 40:
|| February 2017 ||  Test at ESPEC https://www.espec.co.jp/products/trustee/ ||
|| March 2017 || Install start at Kamioka ||
|| May 2017 || Install end at Kamioka ||
|| February 2017 || Implementation at IMS ||
|| March 2017 || Install at Kamioka ||

Current Status

  1. Sensors except for one sensor were received. -> Printed circuit board assembling will be started.

  2. Drawing the box for Raspeberry Pi and sensors -> We are waiting for the test box.

  3. Software: almost done. (database)

Not yet decided

  1. Power cable 3 m (Internal budget will be used.)
  2. LAN cable ?? m (10 m is enough?) (Which grant will be used?)
  3. IP issue (KAGRA DAQ IP system) At least 12 IPs for KAGRA DAQ network are required. Please negotiate this to Miyakawa-san.
  4. 12 Fiber Media Converters are required for installing. (Please check this to Miyoki-san? Miyakawa-san?)
  5. Installing rack or table. (Which grant will be used?) PCR-54WM [https://www.monotaro.com/g/01406700/]

Aim

To monitor the tunnel environment except the center and end ares.

Construction

  1. Sensor (Raspberry Pi 2B based + EPICS)
  2. Monitor map system (Not yet)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

  1. Temperature (SHT-25)

  2. Humidity (SHT-25)

  3. Air pressure (BM1383GLV: Rohm)

  4. Magnetic field (AMI306R: Aichi Steel)

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Updated information: initial install number at the network point w/ wired LAN is 6 for each arm.

Special Meeting

Meeting Information w/ Miyo, Yamamoto, and Shikano on 10/27/2016

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Implementation at IMS

March 2017

Install at Kamioka