* Aim | == Aim == |
Line 4: | Line 4: |
* Construction | == Construction == |
Line 8: | Line 8: |
* Monitor map | == Monitor map == We should decide the required sampling rate and resolution. |
Line 10: | Line 12: |
Line 11: | Line 14: |
Line 12: | Line 16: |
Line 13: | Line 18: |
Line 15: | Line 21: |
* How many? | == How many? == |
Line 18: | Line 24: |
* Budget | == Budget == |
Line 21: | Line 27: |
* Schedule September 2016: Test the sensors at IMS (#3) October 2016: Adjustment November 2016: First trial sensors from IMS to Kamioka (#5) December 2016: Adjustment January 2017: All sensors will be installed at Kamioka. |
== Schedule == || September 2016 || Test the sensors at IMS (#3) || || October 2016 || Adjustment || || November 2016 || First trial sensors from IMS to Kamioka (#5) || || December 2016 || Adjustment || || January 2017 || All sensors will be installed at Kamioka. || |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution.
1. Temperature
2. Humidity
3. Air pressure
4. Magnetic field
5. Wind speed / direction
How many?
Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30.
Budget
500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences
Schedule
September 2016 |
Test the sensors at IMS (#3) |
October 2016 |
Adjustment |
November 2016 |
First trial sensors from IMS to Kamioka (#5) |
December 2016 |
Adjustment |
January 2017 |
All sensors will be installed at Kamioka. |