Differences between revisions 25 and 28 (spanning 3 versions)
Revision 25 as of 2016-12-27 02:42:53
Size: 2382
Comment:
Revision 28 as of 2016-12-27 02:46:52
Size: 2506
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
== Confirmed issues == == Discussion issues ==
Line 12: Line 12:
 6. Timing issue: [[http://www.jst.mfeed.ad.jp/about/04.html|Outside NTP]]? NTP server for KAGRA from KAGRA timing system

Current Status

  1. Sensors except for one sensor were received. -> Printed circuit board assembling will be started.

  2. Drawing the box for Raspeberry Pi and sensors -> We are waiting for the test box. PFF10-4-7W for sensor and SPCM181810T for Raspberry Pi + Power line

  3. Software: almost done. (database)

Discussion issues

  1. Power cable 3 m (Internal budget will be used.)
  2. LAN cable ?? m (10 m is enough?) (Which grant will be used?)
  3. IP issue (KAGRA DAQ IP system) At least 12 IPs for KAGRA DAQ network are required. Please negotiate this to Miyakawa-san.
  4. 12 Fiber Media Converters are required for installing. (Please check this to Miyoki-san? Miyakawa-san?)
  5. Installing rack or table. (Which grant will be used?) PCR-54WM

  6. Timing issue: Outside NTP? NTP server for KAGRA from KAGRA timing system

Aim

To monitor the tunnel environment except the center and end ares.

Construction

  1. Sensor (Raspberry Pi 2B based + EPICS)
  2. Monitor map system (Not yet)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

  1. Temperature (SHT-25)

  2. Humidity (SHT-25)

  3. Air pressure (BM1383GLV: Rohm)

  4. Magnetic field (AMI306R: Aichi Steel)

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Updated information: initial install number at the network point w/ wired LAN is 6 for each arm.

Special Meeting

Meeting Information w/ Miyo, Yamamoto, and Shikano on 10/27/2016

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Implementation at IMS

March 2017

Install at Kamioka

KAGRA/Subgroups/DET/armEnvMon (last edited 2017-01-16 23:41:09 by YutakaShikano)