819
Comment:
|
1285
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
1. Temperature 2. Humidity 3. Air pressure 4. Magnetic field |
We should decide the required sampling rate and resolution. Target: 10 Hz sampling 1. Temperature (SHT-25) 2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025 3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure 4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi |
Line 16: | Line 25: |
Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30. | Every 200 m, we put the sensor. The estimated number of the sensors is 30. |
Line 22: | Line 31: |
|| September 2016 || Test the sensors at IMS (#3) || || October 2016 || Adjustment || || November 2016 || First trial sensors from IMS to Kamioka (#5) || || December 2016 || Adjustment || || January 2017 || All sensors will be installed at Kamioka. || |
|| October 2016 || Test the sensors at IMS (#3) || || November 2016 || First trial sensors from IMS to Kamioka (#5) / Preliminary sensor || || December 2016 || Adjustment / EPICS developmenet || || January 2017 || Building up all sensors is started. || || February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ || || March 2017 || Install at Kamioka || |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
1. Temperature (SHT-25)
2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025
3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure
4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi
5. Wind speed / direction
How many?
Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Budget
500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences
Schedule
October 2016 |
Test the sensors at IMS (#3) |
November 2016 |
First trial sensors from IMS to Kamioka (#5) / Preliminary sensor |
December 2016 |
Adjustment / EPICS developmenet |
January 2017 |
Building up all sensors is started. |
February 2017 |
Test at ESPEC https://www.espec.co.jp/products/trustee/ |
March 2017 |
Install at Kamioka |