Differences between revisions 4 and 11 (spanning 7 versions)
Revision 4 as of 2016-08-09 06:21:50
Size: 890
Comment:
Revision 11 as of 2016-10-28 08:48:07
Size: 1557
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
We should decide the required sampling rate and resolution. We should decide the required sampling rate and resolution. Target: 10 Hz sampling
Line 11: Line 11:
1. Temperature 1. Temperature (SHT-25)
Line 13: Line 13:
2. Humidity 2. Humidity (SHT-25)
https://strawberry-linux.com/catalog/items?code=80025
Line 15: Line 16:
3. Air pressure 3. Air pressure (BM1383GLV: Rohm)
http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure
Line 17: Line 19:
4. Magnetic field 4. Magnetic field (BM1422GMV: Rohm)
http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi
Line 19: Line 22:
5. Wind speed / direction 5. Camera
http://mizna.hatenablog.com/entry/2014/11/17/171127 [[http://cubic9.com/Devel/%C5%C5%BB%D2%B9%A9%BA%EE/RaspberryPi/%A5%A6%A5%A7%A5%D6%A5%AB%A5%E1%A5%E9%A4%C7%A5%B9%A5%C8%A5%EA%A1%BC%A5%DF%A5%F3%A5%B0/|参考記事]]
Line 22: Line 26:
Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30. Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Line 28: Line 32:
|| September 2016 || Test the sensors at IMS (#3) ||
|| October 2016 || Adjustment
||
|| November 2016 || First trial sensors from IMS to Kamioka (#5) ||
|| December 2016 || Adjustment ||
|| January 2017 || All sensors will be installed at Kamioka. ||
|| October 2016 || Test the sensors at IMS (#3) w Preliminary sensor ||
|| November 2016 || First trial sensors from IMS to Kamioka (#3) w Preliminary sensor ||
|| December 2016 || Adjustment / EPICS developmenet ||
|| January 2017 || Building up all sensors is started. ||
|| February 2017 || Test at ESPEC https://
www.espec.co.jp/products/trustee/ ||
|| March 2017 || Install start
at Kamioka ||
|| May 2017 || Install end at Kamioka ||

Aim

To monitor the tunnel environment except the center and end ares.

Construction

1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

1. Temperature (SHT-25)

2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025

3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure

4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi

5. Camera http://mizna.hatenablog.com/entry/2014/11/17/171127 参考記事

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Budget

500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Test at ESPEC https://www.espec.co.jp/products/trustee/

March 2017

Install start at Kamioka

May 2017

Install end at Kamioka

KAGRA/Subgroups/DET/armEnvMon (last edited 2017-01-16 23:41:09 by YutakaShikano)