890
Comment:
|
1395
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) |
1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?) |
Line 9: | Line 9: |
We should decide the required sampling rate and resolution. 1. Temperature 2. Humidity 3. Air pressure 4. Magnetic field 5. Wind speed / direction |
We should decide the required sampling rate and resolution. Target: 10 Hz sampling 1. Temperature ([[https://strawberry-linux.com/catalog/items?code=80025|SHT-25]]) 2. Humidity ([[https://strawberry-linux.com/catalog/items?code=80025|SHT-25]]) 3. Air pressure ([[http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure|BM1383GLV: Rohm]]) 4. Magnetic field ([[http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi&defaultGroupId=false|BM1422GMV: Rohm]]) 5. Water-proof Camera |
Line 22: | Line 17: |
Every 200 - 300 m, we put the sensor. The estimated number of the sensors is 20 - 30. | Every 200 m, we put the sensor. The estimated number of the sensors is 30. |
Line 24: | Line 19: |
== Budget == 500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences |
== Special Meeting == [[attachment:meeting_miyo_yamamoto.txt|Meeting Information]] |
Line 28: | Line 23: |
|| September 2016 || Test the sensors at IMS (#3) || || October 2016 || Adjustment || || November 2016 || First trial sensors from IMS to Kamioka (#5) || || December 2016 || Adjustment || || January 2017 || All sensors will be installed at Kamioka. || |
|| October 2016 || Test the sensors at IMS (#3) w Preliminary sensor || || November 2016 || First trial sensors from IMS to Kamioka (#3) w Preliminary sensor || || December 2016 || Adjustment / EPICS developmenet || || January 2017 || Building up all sensors is started. || || February 2017 || Test at ESPEC https://www.espec.co.jp/products/trustee/ || || March 2017 || Install start at Kamioka || || May 2017 || Install end at Kamioka || |
Aim
To monitor the tunnel environment except the center and end ares.
Construction
- Sensor (Raspberry Pi 3 based + EPICS)
- Monitor map system (software: EPICS based?)
Monitor map
We should decide the required sampling rate and resolution. Target: 10 Hz sampling
Temperature (SHT-25)
Humidity (SHT-25)
Air pressure (BM1383GLV: Rohm)
Magnetic field (BM1422GMV: Rohm)
- Water-proof Camera
How many?
Every 200 m, we put the sensor. The estimated number of the sensors is 30.
Special Meeting
Schedule
October 2016 |
Test the sensors at IMS (#3) w Preliminary sensor |
November 2016 |
First trial sensors from IMS to Kamioka (#3) w Preliminary sensor |
December 2016 |
Adjustment / EPICS developmenet |
January 2017 |
Building up all sensors is started. |
February 2017 |
Test at ESPEC https://www.espec.co.jp/products/trustee/ |
March 2017 |
Install start at Kamioka |
May 2017 |
Install end at Kamioka |