Aim

To monitor the tunnel environment except the center and end ares.

Construction

1. Sensor (Raspberry Pi 3 based + EPICS) 2. Monitor map system (software: EPICS based?)

Monitor map

We should decide the required sampling rate and resolution. Target: 10 Hz sampling

1. Temperature (SHT-25)

2. Humidity (SHT-25) https://strawberry-linux.com/catalog/items?code=80025

3. Air pressure (BM1383GLV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2014-12-11_ad_pressure

4. Magnetic field (BM1422GMV: Rohm) http://www.rohm.co.jp/web/japan/news-detail?news-title=2015-06-17_ad_mi

5. Camera http://mizna.hatenablog.com/entry/2014/11/17/171127 ε‚θ€ƒθ¨˜δΊ‹

How many?

Every 200 m, we put the sensor. The estimated number of the sensors is 30.

Budget

500,000 JPY from Shikano Group at Institute for Molecular Science (IMS), National Institutes of Natural Sciences

Schedule

October 2016

Test the sensors at IMS (#3) w Preliminary sensor

November 2016

First trial sensors from IMS to Kamioka (#3) w Preliminary sensor

December 2016

Adjustment / EPICS developmenet

January 2017

Building up all sensors is started.

February 2017

Test at ESPEC https://www.espec.co.jp/products/trustee/

March 2017

Install start at Kamioka

May 2017

Install end at Kamioka