⇤ ← Revision 1 as of 2013-07-03 15:59:58
Size: 1146
Comment:
|
Size: 1727
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Digital system subgroup meeting on 2013/6/12 16:00- (JST) == | == Digital system subgroup meeting on 2013/7/3 16:00- (JST) == |
Line 18: | Line 18: |
* 完了。 | * 完了。(blog [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/building-nds-daqd-for-rts26.html|1]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/stda-update-to-rts26-complete.html|2]]) |
Line 20: | Line 20: |
* かなり手こずっている。とりあえずkernelのアップデートがもう少しで完了しそう。 | * かなり手こずっている。(blog [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/rts-update-to-26-on-sns.html|1]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/07/open-mx-trouble-on-sns-with-kernel-308.html|2]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/07/mx-trouble-on-master-of-sns-with-kernel-308.html|3]]) * とりあえずkernelのアップデートがもう少しで完了しそう。 |
Digital system subgroup meeting on 2013/7/3 16:00- (JST)
出席者: 宮川、上泉、高橋、端山、横澤、田中、譲原、山本、神田
1. 回路制作
- VIS回路アイテム確認: LVDT driver, Coil driver
- 明日打ち合わせ予定
- IOO回路アイテム確認: FSS, PMC, HV電源
- HV電源は菊水の AN250-4.5A, 0〜250V/0〜4.5Aを5台見積り依頼中
MIF回路アイテム確認: I&Q demodulator
- AOS回路アイテム確認: Oplev
- 明日打ち合わせ予定
2. RTS update状況
3. IRIG-Bテスト経過報告
- 手持ちのGPSアンテナが作動せず。Columbia大に問い合わせ、動作が確認できているものを発注した。
4. iKAGRA用Data storage現状確認
5. DC電源手配状況
- 仕様書完成。入札へと進む予定。
6. 現状報告(もしあれば)