Differences between revisions 1 and 2
Revision 1 as of 2013-07-03 15:59:58
Size: 1146
Comment:
Revision 2 as of 2013-07-03 16:07:06
Size: 1727
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Digital system subgroup meeting on 2013/6/12 16:00- (JST) == == Digital system subgroup meeting on 2013/7/3 16:00- (JST) ==
Line 18: Line 18:
  * 完了。   * 完了。(blog [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/building-nds-daqd-for-rts26.html|1]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/stda-update-to-rts26-complete.html|2]])
Line 20: Line 20:
  * かなり手こずっている。とりあえずkernelのアップデートがもう少しで完了しそう。   * かなり手こずっている。(blog [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/06/rts-update-to-26-on-sns.html|1]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/07/open-mx-trouble-on-sns-with-kernel-308.html|2]], [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2013/07/mx-trouble-on-master-of-sns-with-kernel-308.html|3]])
  * とりあえずkernelのアップデートがもう少しで完了しそう。

Digital system subgroup meeting on 2013/7/3 16:00- (JST)

出席者: 宮川、上泉、高橋、端山、横澤、田中、譲原、山本、神田


1. 回路制作

  • VIS回路アイテム確認: LVDT driver, Coil driver
    • 明日打ち合わせ予定
  • IOO回路アイテム確認: FSS, PMC, HV電源
    • HV電源は菊水の AN250-4.5A, 0〜250V/0〜4.5Aを5台見積り依頼中
  • MIF回路アイテム確認: I&Q demodulator

  • AOS回路アイテム確認: Oplev
    • 明日打ち合わせ予定

2. RTS update状況

  • STDA1
    • 完了。(blog 1, 2)

  • SNS
    • かなり手こずっている。(blog 1, 2, 3)

    • とりあえずkernelのアップデートがもう少しで完了しそう。
  • LNS
    • SNS完了後、構築を継続

3. IRIG-Bテスト経過報告

  • 手持ちのGPSアンテナが作動せず。Columbia大に問い合わせ、動作が確認できているものを発注した。

4. iKAGRA用Data storage現状確認

5. DC電源手配状況

  • 仕様書完成。入札へと進む予定。

6. 現状報告(もしあれば)

7. その他

KAGRA/Subgroups/DGS/Meeting/20130703/minute (last edited 2013-07-03 17:10:21 by OsamuMiyakawa)