Line 1: | Line 1: |
=== Hardware setup === * --(Copy current HDD)-- (6/20/2011 done) * --(Bootserver on rack)-- (6/17/2011 done) * --(RT-FE 1 on rack)-- (6/20/2011 done) * --(RT-FE 2 on rack)-- (7/20/2011 done) * --(General network wireless router setup)-- (6/24/2011 done) * --(SSH port forwarding to 192.168.10.10)-- (6/24/2011 done) |
|
Line 14: | Line 5: |
=== File server === * PC setup |
* File server (P:12/15/2013 - 12/25/2013) * PC setup (P:12/15/2013 - 12/20/2013) |
Line 17: | Line 8: |
=== Data Concentrator === * PC setup |
* Data Concentrator (2013/12/10-2013/12/20) * PC setup (2013/12/10-2013/12/10) * --(Myrinet card1 set)-- (2013/12/10 - 2013/12/10 done) * --(Myrinet card2 set)-- (2013/12/10 - 2013/12/10 done) * HDD copy (P:12/10/2013 - 12/10/2013) * host name change (P:12/10/2013 - 12/11/2013) * daqd running (P:12/11/2013 - 12/15/2013) |
Boot server
PC setup
kernel to 3.0.8 (??/??/2013 - ??/??/2013)
- File server (P:12/15/2013 - 12/25/2013)
- PC setup (P:12/15/2013 - 12/20/2013)
- Data Concentrator (2013/12/10-2013/12/20)
- PC setup (2013/12/10-2013/12/10)
Myrinet card1 set (2013/12/10 - 2013/12/10 done)
Myrinet card2 set (2013/12/10 - 2013/12/10 done)
- HDD copy (P:12/10/2013 - 12/10/2013)
- host name change (P:12/10/2013 - 12/11/2013)
- daqd running (P:12/11/2013 - 12/15/2013)
NDS 1
- PC setup
NDS 1
- PC setup
Frame Writer 1
- PC setup
Frame Writer 1
- PC setup
Local storage 1
Hardware setup (??/??/?? - ??/??/?? done)
- test connection (??/??/?? - )
- Connection to FEFS (??/??/?? - )
Local storage 2
Hardware setup (??/??/?? - ??/??/?? done)
- test connection (??/??/?? - )
- Connection to FEFS (??/??/?? - )
Real-time front end 1
RT PC setup (??/??/2013 done)
IO chassis (??/??/2013 done)
Real-time front end 2
RT PC setup (?/??/2013 done)
IO chassis (?/??/2013 done)
Real-time front end 3
RT PC setup (12/4/2013 done)
IO chassis (12/4/2013 done)
Connection to boot server (12/??/2013 - 12/3/2013 done)
Client WS 1
PC setup (??/??/2013 done)
- External backup HDD setup
- backup completed HDD === Network ===
10Gb switch (??/??/2013 done)
Dolphin newtwork (11/12/2013 done)
Reflective Memory network (12/4/2013 done)
Timing
GPS antenna (??/??/2013 done)
- IRG-B card