=== Common ===

 * Timing
  * GPS antenna (2013/4/8 - 2013/9/25 done)
  * IRG-B chassis (2013/4/8 - 2013/9/25 done)


=== A rack ===
Line 6: Line 15:

=== N rack ===
Line 17: Line 28:

=== D rack ===

 * --(10Gb switch)-- (2013/7/20 - 2013/7/22 done)
Line 46: Line 61:
=== C rack ===
Line 69: Line 86:
=== Desk ===
Line 74: Line 93:
 * Network
  * --(10Gb switch)-- (2013/7/20 - 2013/7/22 done)
Line 77: Line 94:
 * Timing
  * GPS antenna (2013/4/8 - 2013/9/25 done)
  * IRG-B chassis (2013/4/8 - 2013/9/25 done)
Line 81: Line 95:
 * Documentation === Documentation ===

Common

  • Timing
    • GPS antenna (2013/4/8 - 2013/9/25 done)
    • IRG-B chassis (2013/4/8 - 2013/9/25 done)

A rack

  • NAT1
    • PC setup (2013/4/4 - 2013/4/10 done)

    • NAT setup (2013/5/1 - 2013/5/8 done)

    • DHCP
    • DNS

N rack

  • NAT2 (P:2014/8/1 - 2014/8/31)
  • Boot server (2013/6/6 - P:2013/12/31)
    • PC setup (2013/6/12 - 2013/6/18 done)

    • kernel to 3.0.8 (2013/6/6 - 2013/7/10 done)

    • Release daqd (P:2013/12/10 - P:2013/12/20)
    • Release nds (P:2013/12/20 - 2013/12/31)
  • File server (P:12/15/2013 - 12/25/2013)
    • PC setup (P:12/15/2013 - 12/20/2013)

D rack

  • 10Gb switch (2013/7/20 - 2013/7/22 done)

  • Data Concentrator (2013/12/10 - P:2013/12/20)
    • PC setup (2013/12/10-2013/12/10)
    • Myrinet card1 set (2013/12/10 - 2013/12/10 done)

    • Myrinet card2 set (2013/12/10 - 2013/12/10 done)

    • HDD copy (P:2013/12/10 - 2013/12/10)
    • host name change (P:2013/12/10 - 2013/12/11)
    • daqd running (P:2013/12/11 - 2013/12/15)
  • NDS 1 (P:2013/12/20 - 2013/12/31)
    • PC setup
  • NDS 2 (P:2014/3/1 - 2014/3/31)
    • PC setup
  • Frame Writer 1 (P:2014/1/5 - 2014/1/20)
    • PC setup
  • Frame Writer 2 (P:2014/1/5 - 2014/1/20)
    • PC setup
  • Local storage 1
    • Hardware setup (2013/5/31 - 2013/5/31 done)

    • Connection to FEFS (P:2014/2/1 - 2014/2/28)
  • Local storage 2
    • Hardware setup (2013/5/31 - 2013/5/31 done)

    • Connection to FEFS (P:2014/2/1 - 2014/2/28)

C rack

  • Real-time front end 1 (2013/4/9 - 2013/12/3 done)

    • RT PC setup (2013/4/9 - 2013/4/9 done)

    • IO chassis (2013/7/16 - 2013/7/17 done)

    • Connection to boot server (2013/4/9 - 2013/6/6 done)

    • IRIG-B synchronization (2013/11/12 - 2013/12/3 done)

    • DAQ connection (2013/11/8 - 2013/11/11 done)

  • Real-time front end 2 (2013/4/10 - 2013/12/3 done)

    • RT PC setup (2013/4/10 - 2013/4/10 done)

    • IO chassis (2013/11/8 - 2013/11/11 done)

    • Connection to boot server (2013/6/6 - 2013/6/6 done)

    • IRIG-B synchronization (2013/11/12 - 2013/12/3 done)

    • DAQ connection (2013/11/8 - 2013/11/11 done)

    • Dolphin connection (2013/11/12 - 2013/12/3 done)

  • Real-time front end 3 (2013/4/9 - 2013/12/5 done)

    • RT PC setup (2013/4/9 - 2013/4/9 done)

    • IO chassis (2013/11/12 - 2013/12/4 done)

    • Connection to boot server (2013/12/3 - 2013/12/3 done)

    • IRIG-B synchronization (2013/12/3 - 2013/12/3 done)

    • DAQ connection (2013/12/3 - 2013/12/3 done)

    • RFM connection (2013/12/3 - 2013/12/5 done)

Desk

  • Client WS 1
    • PC setup (2013/4/10 - 2013/4/25 done)

    • External backup HDD setup
    • backup completed HDD