Size: 4004
Comment:
|
Size: 4385
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* remote power on test | |
Line 9: | Line 10: |
Line 28: | Line 30: |
* raid setup (P:2014/2/1 - 2014/2/28) | |
Line 48: | Line 51: |
* raid setup (P:2014/2/1 - 2014/2/28) | |
Line 62: | Line 65: |
* --(HDD copy)-- (2013/12/19 - 2013/12/19) | |
Line 64: | Line 68: |
* --(HDD copy)-- (2013/12/19 - 2013/12/19) | |
Line 68: | Line 71: |
* Frame Writer 2 (P:2014/1/5 - 2014/1/20) * PC setup |
* Frame Writer 2 (2014/1/15 - P:2014/1/20) * HDD copy (P:2014/1/15 - 2014/1/15) * PC setup (P:2014/1/15 - 2014/1/15) * Myrinet card1 set (P:2014/1/15 - 2014/1/15) * Myrinet card2 set (P:2014/1/15 - 2014/1/15) * host name change (P:2014/1/15 - 2014/1/20) * daqd for frame writer running (P:2014/1/20 - 2014/1/25) |
Common
- Timing
GPS antenna (2013/4/8 - 2013/9/25 done)
IRG-B chassis (2013/4/8 - 2013/9/25 done)
- UPS test
- remote power on test
- RAID test
A rack
- NAT1
PC setup (2013/4/4 - 2013/4/10 done)
NAT setup (2013/5/1 - 2013/5/8 done)
- DHCP
- DNS
N rack
- NAT2 (P:2014/8/1 - 2014/8/31)
- Boot server (2013/6/6 - P:2013/12/31)
PC setup (2013/6/12 - 2013/6/18 done)
kernel to 3.0.8 (2013/6/6 - 2013/7/10 done)
Release daqd (2013/12/13 - 2013/12/13)
Release nds (2013/12/23 - 2013/12/13)
host name change to k1boot (2013/12/18 - 2013/12/18)
- raid setup (P:2014/2/1 - 2014/2/28)
- File server (P:2013/12/15 - 2013/12/25)
- PC setup (P:2013/12/15 - 2013/12/20)
D rack
Replacement to new rack (2014/1/9 - 2014/1/10 done)
10Gb switch (2013/7/20 - 2013/7/22 done)
- Data Concentrator (2013/12/10 - P:2013/12/20)
PC setup (2013/12/10-2013/12/10) done
Myrinet card1 set (2013/12/10 - 2013/12/10 done)
Myrinet card2 set (2013/12/10 - 2013/12/10 done)
HDD copy (2013/12/10 - 2013/12/10 done)
host name change (2013/12/13 - 2013/12/13)
daqd running (2013/12/13 - 2013/12/13)
nds running (2013/12/13 - 2013/12/13)
Check data storing (2013/12/13 - 2013/12/13)
Release nds (2013/12/20 - 2013/12/20)
daqd as dc running (2013/12/20 - 2013/12/20)
- raid setup (P:2014/2/1 - 2014/2/28)
- NDS 1 (P:2013/12/20 - 2013/12/31)
PC setup (2013/12/13 - 2013/12/13)
Myrinet card set (2013/12/13 - 2013/12/13 done)
HDD copy (2013/12/19 - 2013/12/19)
host name change (2013/12/19 - 2013/12/19)
nds running (2013/12/20 - 2013/12/27)
- NDS 2 (P:2014/3/1 - 2014/3/31)
- PC setup
- Frame Writer 1 (P:2014/1/5 - 2014/1/20)
PC setup (2013/12/17 - 2013/12/17)
HDD copy (2013/12/19 - 2013/12/19)
Myrinet card1 set (2013/12/17 - 2013/12/17 done)
Myrinet card2 set (2013/12/17 - 2013/12/17 done)
host name change (2013/12/19 - 2013/12/19)
daqd for frame writer running (2013/12/20 - 2013/12/27)
- Frame Writer 2 (2014/1/15 - P:2014/1/20)
- HDD copy (P:2014/1/15 - 2014/1/15)
- PC setup (P:2014/1/15 - 2014/1/15)
- Myrinet card1 set (P:2014/1/15 - 2014/1/15)
- Myrinet card2 set (P:2014/1/15 - 2014/1/15)
- host name change (P:2014/1/15 - 2014/1/20)
- daqd for frame writer running (P:2014/1/20 - 2014/1/25)
- Local storage 1
Hardware setup (2013/5/31 - 2013/5/31 done)
- Connection to FEFS (P:2014/2/1 - 2014/2/28)
- Local storage 2
Hardware setup (2013/5/31 - 2013/5/31 done)
- Connection to FEFS (P:2014/2/1 - 2014/2/28)
C rack
Real-time front end 1 (2013/4/9 - 2013/12/3 done)
RT PC setup (2013/4/9 - 2013/4/9 done)
IO chassis (2013/7/16 - 2013/7/17 done)
Connection to boot server (2013/4/9 - 2013/6/6 done)
IRIG-B synchronization (2013/11/12 - 2013/12/3 done)
DAQ connection (2013/11/8 - 2013/11/11 done)
Real-time front end 2 (2013/4/10 - 2013/12/3 done)
RT PC setup (2013/4/10 - 2013/4/10 done)
IO chassis (2013/11/8 - 2013/11/11 done)
Connection to boot server (2013/6/6 - 2013/6/6 done)
IRIG-B synchronization (2013/11/12 - 2013/12/3 done)
DAQ connection (2013/11/8 - 2013/11/11 done)
Dolphin connection (2013/11/12 - 2013/12/3 done)
Real-time front end 3 (2013/4/9 - 2013/12/5 done)
RT PC setup (2013/4/9 - 2013/4/9 done)
IO chassis (2013/11/12 - 2013/12/4 done)
Connection to boot server (2013/12/3 - 2013/12/3 done)
IRIG-B synchronization (2013/12/3 - 2013/12/3 done)
DAQ connection (2013/12/3 - 2013/12/3 done)
RFM connection (2013/12/3 - 2013/12/5 done)
Desk
- Client WS 1
PC setup (2013/4/10 - 2013/4/25 done)
- External backup HDD setup
- backup completed HDD
- Client WS 2
- PC setup (P:2014/2/1 - 2014/2/28)
- Science Linux
- NFS mount for user area
- latest gds installation
- PC setup (P:2014/2/1 - 2014/2/28)