Differences between revisions 25 and 26
Revision 25 as of 2014-01-20 12:49:52
Size: 4377
Comment:
Revision 26 as of 2014-01-20 14:40:32
Size: 4406
Comment:
Deletions are marked like this. Additions are marked like this.
Line 72: Line 72:
  * HDD copy (2014/1/15 - 2014/1/15)
  * PC setup (2014/1/15 - 2014/1/15)
  * Myrinet card1 set (2014/1/20 - 2014/1/20)
  *
Myrinet card2 set (2014/1/20 - 2014/1/20)
  *
host name change (2014/1/20 - P:2014/1/21)
  *
daqd for frame writer running (P:2014/1/21 - 2014/1/24)
  * --(HDD copy (2014/1/15 - 2014/1/15)
  * --(PC setup)-- (2014/1/15 - 2014/1/15)
  * --(Myrinet card1 set)-- (2014/1/20 - 2014/1/20)
  * --(
Myrinet card2 set)-- (2014/1/20 - 2014/1/20)
  * --(
host name change)-- (2014/1/20 - 2014/1/20)
  * --(
daqd for frame writer running)-- (2014/1/20 - 2014/1/20)

Common

  • Timing
    • GPS antenna (2013/4/8 - 2013/9/25 done)

    • IRG-B chassis (2013/4/8 - 2013/9/25 done)

  • UPS test
  • remote power on test
  • RAID test

A rack

  • NAT1
    • PC setup (2013/4/4 - 2013/4/10 done)

    • NAT setup (2013/5/1 - 2013/5/8 done)

    • DHCP
    • DNS

N rack

  • NAT2 (P:2014/8/1 - 2014/8/31)
  • Boot server (2013/6/6 - P:2013/12/31)
    • PC setup (2013/6/12 - 2013/6/18 done)

    • kernel to 3.0.8 (2013/6/6 - 2013/7/10 done)

    • Release daqd (2013/12/13 - 2013/12/13)

    • Release nds (2013/12/23 - 2013/12/13)

    • host name change to k1boot (2013/12/18 - 2013/12/18)

    • raid setup (P:2014/2/1 - 2014/2/28)
  • File server (P:2013/12/15 - 2013/12/25)
    • PC setup (P:2013/12/15 - 2013/12/20)

D rack

  • Replacement to new rack (2014/1/9 - 2014/1/10 done)

  • 10Gb switch (2013/7/20 - 2013/7/22 done)

  • Data Concentrator (2013/12/10 - P:2013/12/20)
    • PC setup (2013/12/10-2013/12/10) done

    • Myrinet card1 set (2013/12/10 - 2013/12/10 done)

    • Myrinet card2 set (2013/12/10 - 2013/12/10 done)

    • HDD copy (2013/12/10 - 2013/12/10 done)

    • host name change (2013/12/13 - 2013/12/13)

    • daqd running (2013/12/13 - 2013/12/13)

    • nds running (2013/12/13 - 2013/12/13)

    • Check data storing (2013/12/13 - 2013/12/13)

    • Release nds (2013/12/20 - 2013/12/20)

    • daqd as dc running (2013/12/20 - 2013/12/20)

    • raid setup (P:2014/2/1 - 2014/2/28)
  • NDS 1 (P:2013/12/20 - 2013/12/31)
    • PC setup (2013/12/13 - 2013/12/13)

    • Myrinet card set (2013/12/13 - 2013/12/13 done)

    • HDD copy (2013/12/19 - 2013/12/19)

    • host name change (2013/12/19 - 2013/12/19)

    • nds running (2013/12/20 - 2013/12/27)

  • NDS 2 (P:2014/3/1 - 2014/3/31)
    • PC setup
  • Frame Writer 1 (P:2014/1/5 - 2014/1/20)
    • PC setup (2013/12/17 - 2013/12/17)

    • HDD copy (2013/12/19 - 2013/12/19)

    • Myrinet card1 set (2013/12/17 - 2013/12/17 done)

    • Myrinet card2 set (2013/12/17 - 2013/12/17 done)

    • host name change (2013/12/19 - 2013/12/19)

    • daqd for frame writer running (2013/12/20 - 2013/12/27)

  • Frame Writer 2 (2014/1/15 - P:2014/1/20)
    • HDD copy (2014/1/15 - 2014/1/15)

    • --(PC setup (2014/1/15 - 2014/1/15)

    • Myrinet card1 set (2014/1/20 - 2014/1/20)

    • Myrinet card2 set (2014/1/20 - 2014/1/20)

    • host name change (2014/1/20 - 2014/1/20)

    • daqd for frame writer running (2014/1/20 - 2014/1/20)

  • Local storage 1
    • Hardware setup (2013/5/31 - 2013/5/31 done)

    • Connection to FEFS (P:2014/2/1 - 2014/2/28)
  • Local storage 2
    • Hardware setup (2013/5/31 - 2013/5/31 done)

    • Connection to FEFS (P:2014/2/1 - 2014/2/28)

C rack

  • Real-time front end 1 (2013/4/9 - 2013/12/3 done)

    • RT PC setup (2013/4/9 - 2013/4/9 done)

    • IO chassis (2013/7/16 - 2013/7/17 done)

    • Connection to boot server (2013/4/9 - 2013/6/6 done)

    • IRIG-B synchronization (2013/11/12 - 2013/12/3 done)

    • DAQ connection (2013/11/8 - 2013/11/11 done)

  • Real-time front end 2 (2013/4/10 - 2013/12/3 done)

    • RT PC setup (2013/4/10 - 2013/4/10 done)

    • IO chassis (2013/11/8 - 2013/11/11 done)

    • Connection to boot server (2013/6/6 - 2013/6/6 done)

    • IRIG-B synchronization (2013/11/12 - 2013/12/3 done)

    • DAQ connection (2013/11/8 - 2013/11/11 done)

    • Dolphin connection (2013/11/12 - 2013/12/3 done)

  • Real-time front end 3 (2013/4/9 - 2013/12/5 done)

    • RT PC setup (2013/4/9 - 2013/4/9 done)

    • IO chassis (2013/11/12 - 2013/12/4 done)

    • Connection to boot server (2013/12/3 - 2013/12/3 done)

    • IRIG-B synchronization (2013/12/3 - 2013/12/3 done)

    • DAQ connection (2013/12/3 - 2013/12/3 done)

    • RFM connection (2013/12/3 - 2013/12/5 done)

Desk

  • Client WS 1
    • PC setup (2013/4/10 - 2013/4/25 done)

    • External backup HDD setup
    • backup completed HDD
  • Client WS 2
    • PC setup (P:2014/2/1 - 2014/2/28)
      • Science Linux
      • NFS mount for user area
      • latest gds installation

Documentation

KAGRA/Subgroups/DGS/RTPC/ToDoLNS (last edited 2014-02-12 09:37:04 by OsamuMiyakawa)