Differences between revisions 49 and 68 (spanning 19 versions)
Revision 49 as of 2018-11-15 11:41:31
Size: 635
Editor: KousekiMiyo
Comment:
Revision 68 as of 2018-11-15 15:45:26
Size: 1235
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
||<#E08030 style="text-align:center; ">'''Documents''' ||<#E08030 style="text-align:center; ">'''Sub System''' ||<#E08030 style="text-align:center; ">'''Analysis''' ||<#E08030 style="text-align:center; ">'''Tools''' ||
|| Papers
|| [[KAGRA/Subgroups/GIF/MainStrainmeter|Strainmeter]] || [[ KAGRA/Subgroups/GIF/Parameters | Usefull Parameters]] || [[http://172.16.32.201| DAQ Monitor]] ||
|| || [[KAGRA/Subgroups/GIF/EM| EnvironmentalMonitor ]] || || [[|]] ||
|| || [[KAGRA/Subgroups/GIF/DAQ|Data Acquisition]] || || [[KAGRA/Subgroups/GIF/Gotic2|Gotic2]] ||
= Geophysics Interferometer =

||<#F0F0FF>'''Link''' ||<#F0F0FF>'''Sub System''' ||<#F0F0FF>'''Analysis''' ||<#F0F0FF>'''Tools''' ||
|| [[https://gwdoc.icrr.u-tok
yo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9270|GIF JGWdoc Tree]] || [[KAGRA/Subgroups/GIF/MainStrainmeter|Strainmeter]] || [[ KAGRA/Subgroups/GIF/Parameters | Usefull Parameters]] || [[http://172.16.32.201| DAQ Monitor]] ||
|| [[http://klog.icrr.u-tokyo.ac.jp/osl/|KAGRA log]] || [[KAGRA/Subgroups/GIF/EM| Environmental Sensors ]] || [[CARM Stabilization |]] || [[KAGRA/Subgroups/GIF/Gotic2|Gotic2]] ||
|| [[https://earthquake.usgs.gov/earthquakes/map|Earthquake(USGS)]]|| [[KAGRA/Subgroups/GIF/DAQ|Data Acquisition]] || [[Earthquake Warning|]] || ||
Line 6: Line 8:
|| || [[KAGRA/Subgroups/GIF/RemoteControl|Remote Control]] || || ||

== Definition and scope ==
 1. Construction of two fixed-mirror interferometers (1.5km x 2) along KAGRA, for both geophysical observation and KAGRA baseline monitor. Two vacuum systems have been constructed. One of two interferometer (X arm) is initially constructed.
 2. Arrangement of environment sensors for monitoring the tunnel, rooms, and instruments

Geophysics Interferometer

Link

Sub System

Analysis

Tools

GIF JGWdoc Tree

Strainmeter

Usefull Parameters

DAQ Monitor

KAGRA log

Environmental Sensors

CARM Stabilization

Gotic2

Earthquake(USGS)

Data Acquisition

Earthquake Warning

Frequency Stabilized Laser

Remote Control

Definition and scope

  1. Construction of two fixed-mirror interferometers (1.5km x 2) along KAGRA, for both geophysical observation and KAGRA baseline monitor. Two vacuum systems have been constructed. One of two interferometer (X arm) is initially constructed.
  2. Arrangement of environment sensors for monitoring the tunnel, rooms, and instruments

KAGRA/Subgroups/GIF (last edited 2024-04-02 09:53:34 by AkiteruTakamori)