Line 1: Line 1:
= Arm Length Stabilization System (Green Lock System) = = Arm Length Stabilization System =
 Wiki for ALS
(Arm Length Stabilization; Auxiliary Lock System), a.k.a green lock system
Line 3: Line 4:
== Configuration (One Arm) ==
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0074/E1707416/001/DSC_0055.JPG|ALS Configuration|width=500}}
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0077/T1807771/002/ALSSchematic.png|ALS Configuration|width=500}}
 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7771|JGW-T1807771]]
Line 9: Line 10:
  * DONE
Line 10: Line 12:
 * fiber collimators for green
Line 11: Line 14:
  * Not much difference from noise, cable length point of view.
  * Alignment jitter noise from AOM will be less if fiber comes after AOM. So, let it so.
Line 12: Line 17:
  * DECIDED not to use fiber for PLL (Mar 5, 2018)
Line 16: Line 22:
  * necessity of summing node for common mode servo ([[https://dcc.ligo.org/LIGO-D1300782/public|LIGO-D1300782]])
   * first, try with digital switch and decide (Feb 6, 2018)
Line 25: Line 33:
  * FM option N5181BU-UNT (not yet ordered)
Line 26: Line 35:
 * Frequency counter (optional) [[https://www.keysight.com/ja/pd-1893411-pn-53220A/350-mhz-universal-frequency-counter-timer-12-digits-s-100-ps?cc=JP&lc=jpn|Keysight 53220A]]?  * Frequency counter [[https://www.tek.com/frequency-counter/fca3000-3100|Tektronix FCA3103]] (ready)
Line 31: Line 40:
 * AOM and AOM driver (to be determined)  * AOM G&H 3080-125 (80MHz) and AOM driver G&H 1075FM-1 (1W, 5MHz BW). (ordered)
Line 38: Line 47:
 * Faraday isolator [[https://www.thorlabs.co.jp/thorproduct.cfm?partnumber=IO-5-532-HP|Thorlabs IO-5-532-HP]] (to be ordered)  * Faraday isolator [[https://www.thorlabs.co.jp/thorproduct.cfm?partnumber=IO-5-532-HP|Thorlabs IO-5-532-HP]] (ready)
Line 42: Line 51:
 * Dichroic mirror in-vac: Sigma TFVMQ-50.8C10-20-W1D-532/1064-ARS-30-45D (ready)
Line 44: Line 54:
 * Fiber (under test at UToyama)  * Fiber: Coastal Connections P-FAnskFAnsk-3.5nx/125/3-75 and -80 (under test at UToyama)
Line 47: Line 57:
 * Fiber collimator (Tholabs PAF? Fixed focus collimator?)  * Fiber collimator (Tholabs PAF-X-5-A? [[https://www.thorlabs.co.jp/newgrouppage9.cfm?objectgroup_id=5124|Thorlabs triplet lens collimator]]?)
Line 62: Line 72:
 * Green beam positions [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7775|JGW-T1807775]]

Arm Length Stabilization System

  • Wiki for ALS (Arm Length Stabilization; Auxiliary Lock System), a.k.a green lock system

ALS Configuration

To Do

  • optical layout of PR2/SR2 chambers, POP/POS table
  • select AOM and AOM driver
    • DONE
  • fix green fiber specs, including how to do the laying
  • fiber collimators for green
  • green fiber after EOM/AOM or before EOM/AOM
    • Not much difference from noise, cable length point of view.
    • Alignment jitter noise from AOM will be less if fiber comes after AOM. So, let it so.
  • fiber for PLL beat or not
    • DECIDED not to use fiber for PLL (Mar 5, 2018)
  • where to put frequency offset: PLL or arm length
  • more detailed noisebudget
  • initial alignment planning
  • comm/diff servo topology
    • necessity of summing node for common mode servo (LIGO-D1300782)

      • first, try with digital switch and decide (Feb 6, 2018)
  • lock acquisition scheme

List of Items

Electronics

Opto-electronics

  • Broadband PD for PLL Newport 818-BB-21A (1.2 GHz bandwidth)

  • Resonant PD for green PDH JGW-D1201280

  • AOM G&H 3080-125 (80MHz) and AOM driver G&H 1075FM-1 (1W, 5MHz BW). (ordered)

  • EOM: Qubig xxxxxx (ready)
  • QPD for green beam pointing? (Use Oplev QPD?)
  • Picomotor mount? (ordered)

Optics

  • Faraday isolator Thorlabs IO-5-532-HP (ready)

  • Periscopes Thorlabs Ø1.5inch Post Assembly (ready)

  • Dichroic mirror: LEO DRX-1064/532-45P-UF-2038 (ready)
  • Harmonic splitter: LEO LWP-45-R532-T1064-UF-2038 (ready)
  • Dichroic mirror in-vac: Sigma TFVMQ-50.8C10-20-W1D-532/1064-ARS-30-45D (ready)

Fiber optics

  • Fiber: Coastal Connections P-FAnskFAnsk-3.5nx/125/3-75 and -80 (under test at UToyama)
    • probably with jacket, with endcap, without AR coating
    • polarization maintaining
  • Fiber collimator (Tholabs PAF-X-5-A? Thorlabs triplet lens collimator?)

Drawings

Conceptual

Noisebudget

Documents