Differences between revisions 26 and 39 (spanning 13 versions)
Revision 26 as of 2018-02-08 00:25:38
Size: 4515
Comment:
Revision 39 as of 2018-08-27 11:47:00
Size: 5005
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
== Schematic (One Arm) ==
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0077/T1807771/002/ALSSchematic.png|ALS Configuration|width=500}}
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0077/T1807771/003/ALSSchematic.png|ALS Configuration|width=500}}
Line 11: Line 10:
  * DONE
Line 17: Line 17:
  * DECIDED not to use fiber for PLL (Mar 5, 2018)
Line 22: Line 23:
   * first, try with digital switch and decide    * first, try with digital switch and decide (Feb 6, 2018)
Line 32: Line 33:
  * FM option N5181BU-UNT (not yet ordered)
Line 33: Line 35:
 * Frequency counter (optional) [[https://www.keysight.com/ja/pd-1893411-pn-53220A/350-mhz-universal-frequency-counter-timer-12-digits-s-100-ps?cc=JP&lc=jpn|Keysight 53220A]]?  * Frequency counter [[https://www.tek.com/frequency-counter/fca3000-3100|Tektronix FCA3103]] (ready)
Line 38: Line 40:
 * AOM and AOM driver (to be determined)  * AOM G&H 3080-125 (80MHz) and AOM driver G&H 1075FM-1 (1W, 5MHz BW). (ordered)
Line 45: Line 47:
 * Faraday isolator [[https://www.thorlabs.co.jp/thorproduct.cfm?partnumber=IO-5-532-HP|Thorlabs IO-5-532-HP]] (to be ordered)  * Faraday isolator [[https://www.thorlabs.co.jp/thorproduct.cfm?partnumber=IO-5-532-HP|Thorlabs IO-5-532-HP]] (ready)
Line 47: Line 49:
 * Dichroic mirror: LEO DRX-1064/532-45P-UF-2038 (ready)
 * Harmonic splitter: LEO LWP-45-R532-T1064-UF-2038 (ready)
 * Dichroic mirror for periscopes: LEO DRX-1064/532-45P-UF-2038 (ready: 8pcs(2 each for POP/POS/TRX/TRY))
 * Harmonic splitter: LEO LWP-45-R532-T1064-UF-2038 (ready: 8pcs(1 each for POP/POS/TRX/TRY, 4 spares))
 * Dichroic mirror in-vac: Sigma TFVMQ-50.8C10-20-W1D-532/1064-ARS-30-45D (ready: 4pcs(1 for PR2, 1 for SR2, 2 spares))
Line 51: Line 54:
 * Fiber (under test at UToyama)  * Fiber: Coastal Connections P-FAnskFAnsk-3.5nx/125/3-75 and -80 (under test at UToyama)
Line 54: Line 57:
 * Fiber collimator (Tholabs PAF? Fixed focus collimator?)  * Fiber collimator ([[https://www.thorlabs.co.jp/newgrouppage9.cfm?objectgroup_id=2940|Thorlabs PAF-X-5-A]]? [[https://www.thorlabs.co.jp/newgrouppage9.cfm?objectgroup_id=5124|Thorlabs triplet lens collimator TC06APC-543]]?)

Arm Length Stabilization System

  • Wiki for ALS (Arm Length Stabilization; Auxiliary Lock System), a.k.a green lock system

ALS Configuration

To Do

  • optical layout of PR2/SR2 chambers, POP/POS table
  • select AOM and AOM driver
    • DONE
  • fix green fiber specs, including how to do the laying
  • fiber collimators for green
  • green fiber after EOM/AOM or before EOM/AOM
    • Not much difference from noise, cable length point of view.
    • Alignment jitter noise from AOM will be less if fiber comes after AOM. So, let it so.
  • fiber for PLL beat or not
    • DECIDED not to use fiber for PLL (Mar 5, 2018)
  • where to put frequency offset: PLL or arm length
  • more detailed noisebudget
  • initial alignment planning
  • comm/diff servo topology
    • necessity of summing node for common mode servo (LIGO-D1300782)

      • first, try with digital switch and decide (Feb 6, 2018)
  • lock acquisition scheme

List of Items

Electronics

Opto-electronics

  • Broadband PD for PLL Newport 818-BB-21A (1.2 GHz bandwidth)

  • Resonant PD for green PDH JGW-D1201280

  • AOM G&H 3080-125 (80MHz) and AOM driver G&H 1075FM-1 (1W, 5MHz BW). (ordered)

  • EOM: Qubig xxxxxx (ready)
  • QPD for green beam pointing? (Use Oplev QPD?)
  • Picomotor mount? (ordered)

Optics

  • Faraday isolator Thorlabs IO-5-532-HP (ready)

  • Periscopes Thorlabs Ø1.5inch Post Assembly (ready)

  • Dichroic mirror for periscopes: LEO DRX-1064/532-45P-UF-2038 (ready: 8pcs(2 each for POP/POS/TRX/TRY))
  • Harmonic splitter: LEO LWP-45-R532-T1064-UF-2038 (ready: 8pcs(1 each for POP/POS/TRX/TRY, 4 spares))
  • Dichroic mirror in-vac: Sigma TFVMQ-50.8C10-20-W1D-532/1064-ARS-30-45D (ready: 4pcs(1 for PR2, 1 for SR2, 2 spares))

Fiber optics

Drawings

Conceptual

Noisebudget

Documents

KAGRA/Subgroups/IOO/ALS (last edited 2022-05-09 20:33:42 by miyoki)