= Arm Length Stabilization System = = Arm Length Stabilization System (Green Lock System) =
Line 7: Line 7:
 * optical layout of PR2/SR2 chambers, POP/POS table
 * select AOM and AOM driver
 * fix green fiber specs, including how to do the laying
 * green fiber after EOM/AOM or before EOM/AOM
  * Not much difference from noise, cable length point of view.
  * Alignment jitter noise from AOM will be less if fiber comes after AOM. So, let it so.
 * fiber for PLL beat or not
 * where to put frequency offset: PLL or arm length
 * more detailed noisebudget
 * initial alignment planning
 * comm/diff servo topology
 * lock acquisition scheme
Line 18: Line 30:
=== Optics, Opto-electronics === === Opto-electronics ===
Line 23: Line 35:
  * modulation frequencies are 32 MHz and 33 MHz [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5626|JGW-T1605626]]
Line 33: Line 46:
 * Fiber  * Fiber (under test at UToyama)
  * probably with jacket, with endcap, without AR coating
  * polarization maintaining
Line 36: Line 51:
== Drawings ==
 * PSL table [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6335|JGW-D1706335]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7060|JGW-G1707060]]
 * Fiber layout [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7060|JGW-G1707060]]
 * POP table
 * PR2 in-vac [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6473|JGW-G1706473]]
 * TRX
 * POS table
 * SR2 in-vac
 * TRY
=== Conceptual ===
 * ALS configuration [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5353|JGW-T1605353]] (see Candidate4)
 * Optical layout around PRs [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5261|JGW-T1605261]]
 * Optical layout around SRs [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5967|JGW-T1605967]]

== Noisebudget ==
 * [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/kagranoisebudget/GreenLock]]
Line 37: Line 69:
 * Document tree for ALS [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7769|JGW-E1807769]]

Arm Length Stabilization System (Green Lock System)

Configuration (One Arm)

ALS Configuration

To Do

  • optical layout of PR2/SR2 chambers, POP/POS table
  • select AOM and AOM driver
  • fix green fiber specs, including how to do the laying
  • green fiber after EOM/AOM or before EOM/AOM
    • Not much difference from noise, cable length point of view.
    • Alignment jitter noise from AOM will be less if fiber comes after AOM. So, let it so.
  • fiber for PLL beat or not
  • where to put frequency offset: PLL or arm length
  • more detailed noisebudget
  • initial alignment planning
  • comm/diff servo topology
  • lock acquisition scheme

List of Items

Electronics

Opto-electronics

  • Broadband PD for PLL Newport 818-BB-21A (1.2 GHz bandwidth)

  • Resonant PD for green PDH JGW-D1201280

  • AOM and AOM driver (to be determined)
  • EOM: Qubig xxxxxx (ready)
  • QPD for green beam pointing? (Use Oplev QPD?)
  • Picomotor mount? (ordered)

Optics

Fiber optics

  • Fiber (under test at UToyama)
    • probably with jacket, with endcap, without AR coating
    • polarization maintaining
  • Fiber collimator (Tholabs PAF? Fixed focus collimator?)

Drawings

Conceptual

Noisebudget

Documents