Differences between revisions 8 and 9
Revision 8 as of 2018-02-02 16:19:51
Size: 2762
Comment:
Revision 9 as of 2018-02-02 16:22:35
Size: 2782
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Arm Length Stabilization System = = Arm Length Stabilization System (Green Lock System) =

Arm Length Stabilization System (Green Lock System)

Configuration (One Arm)

ALS Configuration

To Do

  • optical layout of PR2/SR2 chambers, POP/POS table
  • select AOM and AOM driver
  • fix green fiber specs, including how to do the laying
  • green fiber after EOM/AOM or before EOM/AOM
  • where to put frequency offset: PLL or arm length
  • more detailed noisebudget
  • initial alignment planning
  • comm/diff servo topology
  • lock acquisition scheme

List of Items

Electronics

Opto-electronics

  • Broadband PD for PLL Newport 818-BB-21A (1.2 GHz bandwidth)

  • Resonant PD for green PDH JGW-D1201280

  • AOM and AOM driver (to be determined)
  • EOM: Qubig xxxxxx (ready)
  • QPD for green beam pointing? (Use Oplev QPD?)
  • Picomotor mount? (ordered)

Optics

Fiber optics

  • Fiber (under test at UToyama)
    • probably with jacket, with endcap, without AR coating
    • polarization maintaining
  • Fiber collimator (Tholabs PAF? Fixed focus collimator?)

Drawings

  • PSL table
  • POP table
  • PR2 in-vac
  • TRX
  • POS table
  • SR2 in-vac
  • TRY

Documents

KAGRA/Subgroups/IOO/ALS (last edited 2022-05-09 20:33:42 by miyoki)