Size: 422
Comment:
|
Size: 1166
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
Kokeyama, Izumi, Nagano, Uehara, Moriwaki,Matsushima, Furuhata, Yokogawa, Yoshioka | |
Line 8: | Line 9: |
=== Memo related to tilt sensor=== * The tilt sensor is supported by JSPS Core-to-core. * The sensor can measure d\theta directly. * The principle is Mach-Zhender interferometer. * One tilt sensor was installed to MCE. For other two, no space for install. * A difference between OptLev and tilt sensor will be checked. * There are three tilt sensors; one installed. * No phase wrapping(Probably) * Absolute tilt angle can be measured * Dina mic range (5 mrad) is bigger than OptLev's(<1 mrad). * Install is not easy comparing to OptLev install, because there are 4 beam lines. === Memo related to RFAM in EOM=== * AC/DC < 0.0001. |
Monday Meeting 0129
Participants
Kokeyama, Izumi, Nagano, Uehara, Moriwaki,Matsushima, Furuhata, Yokogawa, Yoshioka
Updates from projects
Tiltsensor installation o
=== Memo related to tilt sensor===
- The tilt sensor is supported by JSPS Core-to-core.
- The sensor can measure d\theta directly.
- The principle is Mach-Zhender interferometer.
- One tilt sensor was installed to MCE. For other two, no space for install.
A difference between OptLev and tilt sensor will be checked.
- There are three tilt sensors; one installed.
- No phase wrapping(Probably)
- Absolute tilt angle can be measured
Dina mic range (5 mrad) is bigger than OptLev's(<1 mrad).
Install is not easy comparing to OptLev install, because there are 4 beam lines.
=== Memo related to RFAM in EOM===
AC/DC < 0.0001.
Plan for this week
Kamioka
- 1/30 ISS work
- 1/31-2/2 PMC commissioning
Topic of this week
OMC report (Somiya)